Project details
| Official title | Proposal of Reserved Forest for Construction U/G Water Pipeline, Sump, ESR & BPT of Limkheda RWSS Water Supply Based Kadana Dam Bulk Pipeline, Village:- Choki, Limkheda, Hathiyavan, Zaliyapada, Vadapaliya, Anoppra, Jamri, Sarjumi, Pahad, Zerjitgadh, Khadada (Pada) Taluka:-Limkheda, in District:-Dahod in Gujarat State. (0.9064 Ha). |
|---|---|
| Status | Forest land use approved |
| Status since | 1 Sept 2026 |
| Application filed | 25 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer,gwssb,dahod |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹101.9 crore |
| Village / locality | Padaliya |
| Taluk / tehsil | Limkheda |
| District | Dohad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12555 |
In context
13 applications in Dohad since January 2022 are in the same category (Water & irrigation): 8 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2.4 years from filing to approval. At 2.2 acres, this one is larger than 54% of them.
Where it is
Padaliya, Limkheda, Dohad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation USOF Project Dahod CAT-4 — forest land use approved, 6.1 km away
- Bariya 4G Saturation USOF 2 — forest land use approved, 6.1 km away
- Diversion of Reserve Forest Land for Construction of Eight Lane Delhivadodara… — forest land use approved, 9.3 km away
- Diversion of 0.1026 Ha. Reserved Forest land for the Construction of New… — lapsed, 10.5 km away
- Ninama Minaben Ratnabhai — environmental approval granted, 10.5 km away
- Suthar Vasa Block -1 — environmental approval granted, 10.7 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 10.9 km away
- Shri Sangada Margi Chirangkumar — environmental approval granted, 11.4 km away
More from Executive Engineer,gwssb,dahod in Dohad
- Proposal of Reserved Forest Land for Construction U/G Sump, Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction U/G Water Pipeline, Sump,… — more information requested
- Proposal of Reserved Forest for Construction U/G Water Pipeline, Sump of… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.