Project details
| Status | Lapsed |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 16 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Friends Impex |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹2 crore |
| Village / locality | Chital |
| Taluk / tehsil | Amreli |
| District | Amreli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12630 |
In context
18 applications in Amreli since January 2022 are in the same category (Power): 9 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.5 acres, this one is larger than 80% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chital, Amreli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Crossing Amreli-Chital Road for Laying UG 11 KV Transmission Line — forest land use approved, 300 m away
- 66 kV D/C line from Proposed 66 kV Kuvargadh GETCo S/S Gantry to Proposed 66… — forest land use approved, 6.3 km away
- Laying 11 KV Transmission Line Across MDR Amreli-Chital Road — forest land use approved, 6.8 km away
- Diversion of Protected Forest Land for Widening of Babra – Chital – Amreli… — more information requested, 9.6 km away
- 33 KV S/C Transmission line Crossing SH-31 (Babra-Vasavad) road — in-principle approval, conditions pending, 11.9 km away
- 33 KV S/C Crossing SH-34 (Babra-Amreli) road near vil:Lunaki by Cleanmax… — lapsed, 11.9 km away
- 66KV S/C (3+1) 630Sq.mm Underground Cable from 66KV Nana Machiyala Sub-station… — forest land use approved, 12.3 km away
- 33 KV S/C Crossing SH-34 (Babra-Amreli) road near vil:Bhiladi by Cleanmax… — lapsed, 12.5 km away
More from Friends Impex in Amreli
- Crossing Amreli-Chital Road for Laying UG 11 KV Transmission Line — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.