Quick answers
What is this project?
Permission of Forest Land for laying proposed 66kV D/C Partial Overhead line on Tower and Partial 630 Sq. mm. 2x (3+1) XPLE underground cable line LILO at 66KV Kadvidadra S/S from 66Kv Umarkhadi-Zankhvav line Passing parellel to Pada Apro. Road joining Mandvi-Zankhvav SH in Ta. Zankhvav & Dist. Surat(Proposed Forest Land for Diversion:0.2214 Hac) is a lapsed power project in Gundikuva, Umarpada, Surat, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Getco Bharuch.
Has it been approved?
No. The application was lapsed on 29 Oct 2026, so it is no longer under consideration.
Where is it?
In Gundikuva, Umarpada, Surat, Gujarat.
How big is it?
It has a stated cost of ₹7 crore; a site of 0.7 acres and 2,210 m² of forest land.
When was it filed?
The application was filed on 11 Sept 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 11 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Getco Bharuch |
| Land area | 2,700 m² |
| Forest land | 2,210 m² |
| Project cost | ₹7 crore |
| Village / locality | Gundikuva |
| Taluk / tehsil | Umarpada |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12631 |
In context
39 applications in Surat since January 2022 are in the same category (Power): 22 approved, 13 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.7 acres, this one is smaller than 76% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gundikuva, Umarpada, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission of Forest Land for laying proposed 66kV D/C Partial Overhead line… — more information requested, 850 m away
- Diversion of Forest Land 0.1468 Ha for laying OFC Cable at Jakhvav to Selamba… — lapsed, 1 km away
- Shree Ram Quarry — not approved, 1.3 km away
- Vaibhav Raj Stone Quarry — under environmental review, 1.6 km away
- Chetan Stone Quarry — environmental approval granted, 1.7 km away
- Mining project by M/s. Patidar Stone Industries Reapprasial Area-1.98.30Pvt.… — environmental approval granted, 1.8 km away
- Shri Dhanuben Revbabhai Chaudhari Re-appraisal Area-1.09.27 Survey no.- 97… — environmental approval granted, 3.2 km away
- Mining project by M/s Sahil Stone Crusher Re-appraisalArea-00.42.00,… — environmental approval granted, 3.3 km away
More from Getco Bharuch in Surat
- Permission of Forest Land for laying proposed 66kV D/C Partial Overhead line… — more information requested
- Laying proposed 66kV S/C 630 Sq. mm. (3+1) XPLE underground cable line from… — forest land use approved
- Permission of 0.0123 ha. Forest Land for laying proposed 66kV S/C 630 Sq. mm.… — forest land use approved
- Grant Permission for Diversion of 0.175 Ha of Social Forest Land for Laying of… — lapsed
- Diversion of Forest Land of 0.115hac. for Clearance for Laying of 66KV S/C… — more information requested