Quick answers
What is this project?
Diversion of 0.1155 Hec. of protected forest land for construction of new 220kV D/C Khijadiya (400kV) to Keshod (220kV) line by establishing overhead transmission line is a lapsed power project in Ajab, Keshod, Junagadh, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corporation Limited.
Has it been approved?
No. The application was lapsed on 15 Aug 2026, so it is no longer under consideration.
Where is it?
In Ajab, Keshod, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹35.4 crore; a site of 0.3 acres and 1,160 m² of forest land.
When was it filed?
The application was filed on 12 Mar 2026.
Project details
| Official title | Diversion of 0.1155 Hec. of protected forest land for construction of new 220kV D/C Khijadiya (400kV) to Keshod (220kV) line by establishing overhead transmission line at Village: Ajab, Tal: Keshod, Dist.: Junagadh on Ajab Keshod Road (Major district Road). |
|---|---|
| Status | Lapsed |
| Status since | 15 Aug 2026 |
| Application filed | 12 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 1,200 m² |
| Forest land | 1,160 m² |
| Project cost | ₹35.4 crore |
| Village / locality | Ajab |
| Taluk / tehsil | Keshod |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12790 |
In context
24 applications in Junagadh since January 2022 are in the same category (Power): 1 approved, 9 filed or under review, and 14 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 54% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ajab, Keshod, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Makvana Mayurdhwajsinh Mansiuyabhai. (Block -A) — environmental approval granted, 4.4 km away
- Rameshbhai Karshanbhai Bariya — not approved, 4.7 km away
- Rameshbhai Karshanbhai Bariya — initial checks, 4.7 km away
- Rameshbhai Karshanbhai Bariya — more information requested, 4.7 km away
- Karamta Meramanbhai Naranbhai (Kaneri Blacktrap Mine) — environmental approval granted, 4.8 km away
- Diversion of 0.1295 Hec. protected forest land for construction of new 220kV… — lapsed, 7 km away
- Jagdishbhai Kanabhai Maru — not approved, 7.1 km away
- Black Trap Mine of Mankadiya Arjanbhai Kalabhai — cleared for impact study, 7.2 km away
More from Gujarat Energy Transmission Corporation Limited in Junagadh
- Diversion of 0.1295 Hec. protected forest land for construction of new 220kV… — lapsed
- Diversion of 0.1085 Hec. of Protected Forest Land for Construction of New… — lapsed
- Diversion of 0.0385 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.077 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.3360 Hec. of Protected Forest Land for Construction of New 66KV… — forest land use approved
- Diversion of 0.0035 Hec. Forest Land for Construction of New 66KV S/C Line… — forest land use approved
9 Gujarat Energy Transmission Corporation projects in Junagadh
All 38 Gujarat Energy Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.