Quick answers
What is this project?
Diversion of 0.1085 Hec. of Protected Forest Land for Construction of New 220KV D/C Khijadiya (400KV) to Keshod (220KV) Line by Establishment of Overhead Transmission Line at Vill.: Koylana, Ta.: Keshod, Dist.: Junagadh Across NH-151 (Jetpur-Somnath Road) is a lapsed power project in Lathiya, Keshod, Junagadh, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corporation Limited.
Has it been approved?
No. The application was lapsed on 15 Aug 2026, so it is no longer under consideration.
Where is it?
In Lathiya, Keshod, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹35.4 crore; a site of 0.3 acres and 1,090 m² of forest land.
When was it filed?
The application was filed on 11 Mar 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Aug 2026 |
| Application filed | 11 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 1,100 m² |
| Forest land | 1,090 m² |
| Project cost | ₹35.4 crore |
| Village / locality | Lathiya |
| Taluk / tehsil | Keshod |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13382 |
In context
24 applications in Junagadh since January 2022 are in the same category (Power): 1 approved, 9 filed or under review, and 14 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 67% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lathiya, Keshod, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Narendrabhai Gopalbhai Bariya Re-appraisal Area- 2.00.00Hect Survey no.-47… — environmental approval granted, 2.6 km away
- Laying OFC for Jio Digital Fibre Pvt. Ltd. Junagadh and Gir Somnath Dist. Gir… — forest land use approved, 3.4 km away
- Makvana Mayurdhwajsinh Mansiuyabhai. (Block -A) — environmental approval granted, 6.9 km away
- Mukeshbhai Bhimabhai Sutreja Legal Heir of Samatbhai Bhimabhai Sutreja — lapsed, 7 km away
- Mukeshbhai Bhimabhai Sutreja Heirs of Samat Bhima Sutreja — not approved, 7.2 km away
- Sindhav Satishkumar K — environmental approval granted, 7.3 km away
- Mining project by M/S Vinodchandra Narandas & CO. C/O Laxmanbhai M. Jadeja — not approved, 7.4 km away
- Siddharth Construction Co. — not approved, 7.5 km away
More from Gujarat Energy Transmission Corporation Limited in Junagadh
- Diversion of 0.1155 Hec. of protected forest land for construction of new… — lapsed
- Diversion of 0.1295 Hec. protected forest land for construction of new 220kV… — lapsed
- Diversion of 0.0385 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.077 Hec. Protected Forest Land for Construction of New 220KV… — forest land use approved
- Diversion of 0.3360 Hec. of Protected Forest Land for Construction of New 66KV… — forest land use approved
- Diversion of 0.0035 Hec. Forest Land for Construction of New 66KV S/C Line… — forest land use approved
9 Gujarat Energy Transmission Corporation projects in Junagadh
All 38 Gujarat Energy Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.