Quick answers
What is this project?
Shifting of 66kv D/C Mora - Adani Tower line from Lo.c.no. 18-25 is a proposed power project in Hajira, Chorasi, Surat, Gujarat. The site covers 17 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Hajira, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 17 acres and 16.9 acres (6.9 ha) of forest land.
When was it filed?
The application was filed on 29 May 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 29 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 17 acres (6.9 ha) |
| Forest land | 16.9 acres (6.9 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Hajira |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12981 |
In context
39 applications in Surat since January 2022 are in the same category (Power): 22 approved, 13 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 17 acres, this one is larger than 74% of them.
41 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hajira, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Name change to ArcelorMittal Nippon Steel India Private Limited – Diversion of… — lapsed, 350 m away
- Deep Draft Green Field Captive Port — lapsed, 850 m away
- Name change to ArcelorMittal Nippon Steel India Private Limited – Diversion of… — lapsed, 1.2 km away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — environmental approval granted, 1.3 km away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — environmental approval granted, 1.3 km away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — environmental approval granted, 1.3 km away
- Proposed Expansion of Captive Power Plant Capacity from 270 MW to 300 MW — cleared for impact study, 1.3 km away
- Name change to ArcelorMittal Nippon Steel India Private Limited – Diversion of… — lapsed, 1.4 km away
More from Gujarat Energy Transmission Corp LTD in Surat
- Diversion of Forest Land Having 0.2709 Ha. for Forest Clearance for Laying of… — more information requested
- Diversion of Social Forest Land of 0.1458 Hac. for Forest Clearance for Laying… — forest land use approved
- Diversion of Protected Forest Land of 0.3155 Hac. for Forest Clearance for… — forest land use approved
- 66kv Ichchhapore Variyav2 & Ichchhapore Bhatha UGC link line — forest land use approved
- Submission of Forest Land Proposal for Diversion of Protected Forest Land of… — more information requested
- Forest Land 0.3346hac. for Forest Clearance for Laying of 220KV Under Ground… — forest land use approved
20 Gujarat Energy Transmission Corp projects in Surat
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.