Project details
| Official title | Proposal for FCA Permission - Laying 11 KV - three (3-Nos.) Power Cable Transmission Line on three route i. Valia-Desad Road ii. Zagadia-Valia-Daheli iii. (Ankleshwar-Valia-Netrang), Taluka Valia, Dist – Bharuch- on route from Solar Pooling Sub-Station Valia & Desad Village to GETCO 132 KV Valia Sub-Station, Taluka Valia, District Bharuch – Diversion of Protected Forest Area: 0.0853 Ha |
|---|---|
| Status | Forest land use approved |
| Status since | 12 May 2025 |
| Application filed | 19 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Ecofinite Energy LLP |
| Land area | 900 m² |
| Forest land | 850 m² |
| Project cost | ₹16 lakh |
| Village / locality | Desad |
| Taluk / tehsil | Valia |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12990 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 80% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Desad, Valia, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Set up ground-mounted Solar Park in Valia Taluka Dist Bharuch Diversion of PF… — more information requested, 1.2 km away
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved, 1.3 km away
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending, 1.3 km away
- Submission of Forest Land Proposal for Diversion of Forest Land of 0.2065 Ha.… — more information requested, 2 km away
- Industrial project by M/s. Godrej Industries Ltd. — environmental approval granted, 2.1 km away
- Industrial project by M/s. Godrej Industries Ltd. — cleared for impact study, 2.1 km away
- Industrial project by M/s. Godrej Industries Ltd. — environmental approval granted, 2.1 km away
- Industrial project by M/s. Godrej Industries Ltd. — cleared for impact study, 2.1 km away
More from Ecofinite Energy LLP in Bharuch
- Laying 11 KV- three (3-Nos.) Power Cable Transmission line on route from Solar… — forest land use approved
- Solar Power Ground Mounted Solar Panel Project at Selod, Taluka Jhagadia,… — forest land use approved
All 3 Ecofinite Energy projects across India