Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 28 Sept 2026 |
| Application filed | 7 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 1,000 m² |
| Forest land | 960 m² |
| Project cost | ₹9 lakh |
| Village / locality | Valia |
| Taluk / tehsil | Valia |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12463 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 62% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Valia, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved, 0 m away
- Set up ground-mounted Solar Park in Valia Taluka Dist Bharuch Diversion of PF… — more information requested, 150 m away
- FCA Permission - Laying 11 KV - three (3-Nos.) Power Cable Transmission Line… — forest land use approved, 1.3 km away
- Set up Ground-mounted Solar Panel - Solar Park at Vaghalkod, Taluka Valia,… — more information requested, 2.1 km away
- Diversion of 0.095 Ha. Protected Forest Land for Construct Approach road for… — lapsed, 2.2 km away
- Submission of Forest Land Proposal for Diversion of Forest Land of 0.2065 Ha.… — more information requested, 3 km away
- Industrial project by M/s. Godrej Industries Ltd. — environmental approval granted, 3.4 km away
- Industrial project by M/s. Godrej Industries Ltd. — cleared for impact study, 3.4 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- Diversion of Forest Area – 0.0840 Ha. Permission for laying 33 KV 5-nos.… — forest land use approved
- FCA proposal to set up Solar Park Rajpardi, District Bharuch - Proposed… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.