Quick answers
What is this project?
diversion of 0.8731 -hectare forest land for Laying of 66KV S/C Bagvadar–Ambarama line with 66KV, 1Cx1600sq.mm XLPE Power Cable (3 1) near village Bagvadar Tal. Porbandar & Dist. Porbandar is a lapsed power project in Bagvadar, Porbandar, Gujarat. The site covers 2.2 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 3 Aug 2026, so it is no longer under consideration.
Where is it?
In Bagvadar, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹9.8 crore; a site of 2.2 acres and 580 m² of forest land.
When was it filed?
The application was filed on 23 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Aug 2026 |
| Application filed | 23 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 580 m² |
| Project cost | ₹9.8 crore |
| Village / locality | Bagvadar |
| Taluk / tehsil | Porbandar |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13042 |
In context
9 applications in Porbandar since January 2022 are in the same category (Power): 1 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Bagvadar, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- diversion of 0.8731 -hectare forest land for Laying of 66KV S/C… — more information requested, 0 m away
- Expansion of mining in 90.5279 Ha.Laterite (Survey no. 184, 185, 286, 290,… — environmental approval granted, 7.5 km away
- Permission for Laying Ug Drinking Water Pipeline in Various Road Side Forest… — lapsed, 7.8 km away
- Diversion of 0.61768 ha Social Forest land for Laying of 66KV S/C… — lapsed, 9 km away
- Kantela Black Trap Quarry Lease, Survey No 181 Paiki 1(New-456), Village… — environmental approval granted, 9 km away
- Telecom Network in Ta. Porbandar city and surrounding area — lapsed, 9.6 km away
- Devabhai Bhimabhai Modhavadiya — environmental approval granted, 10.2 km away
- Rambhai Savadasbhai Chauhan — returned to applicant, 10.2 km away
More from Gujarat Energy Transmission Corp LTD in Porbandar
- Diversion of 0.2749 Ha Social Forest land for Laying of 66KV LILO Khapat Line… — lapsed
- diversion of 0.0567 ha Social Forest land for Laying of 220KV LILO Kutiyana… — lapsed
- Diversion of 0.2970 ha Social forest land for 66kV Bakharla LILO Line from… — more information requested
- Diversion of 0.75696 -hectare forest land for Laying of 66KV S/C Kutiyana –… — under forest review
- diversion of 0.8731 -hectare forest land for Laying of 66KV S/C… — more information requested
- Diversion of 0.02821 -hectare forest land for Laying of 66KV S/C Bhomiyavadar… — forest land use approved
9 Gujarat Energy Transmission Corp projects in Porbandar
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.