Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Aug 2025 |
| Application filed | 18 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 800 m² |
| Forest land | 800 m² |
| Project cost | ₹9 lakh |
| Village / locality | Gametha |
| Taluk / tehsil | Padra |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13060 |
In context
19 applications in Vadodara since January 2022 are in the same category (Power): 5 approved, 6 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.2 acres, this one is smaller than 87% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gametha, Padra, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by Milestone Preservatives Pvt. Ltd — initial checks, 400 m away
- 0.1274 Ha. Of Protected Forest Land For the Under Construction of 66 KV S/C,… — forest land use approved, 1.2 km away
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed, 2.2 km away
- Set up Solar Power Project — forest land use approved, 2.2 km away
- Diversion of Forest Area – 0.0960 Ha. User Agency's Jafarpara Village Solar… — more information requested, 4.5 km away
- Change in Product Mix for M/s. Neogen Chemicals Ltd. — initial checks, 4.7 km away
- Industrial project by M/s. Neogen Chemicals Ltd. — initial checks, 4.7 km away
- Proposed Expansion In Existing Unit of M/s. Shiva Performance Materials Pvt.… — environmental approval granted, 4.8 km away
More from Kpi Green Energy Limited in Vadodara
- Set up Solar Power Project — forest land use approved
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed
- Diversion of Forest Area – 0.0960 Ha. User Agency's Jafarpara Village Solar… — more information requested
- To set up ground-mounted panels Solar Park in Jambusar Taluka — more information requested
5 Kpi Green Energy projects in Vadodara
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.