Project details
| Official title | Set up Solar Power Project in Jafarpara Village, Taluka Jambusar, Dist: Bharuch. Diversion of Forest Land 0.5660 |
|---|---|
| Status | Forest land use approved |
| Status since | 30 Sept 2026 |
| Application filed | 26 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Gavasad |
| Taluk / tehsil | Padra |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13229 |
In context
19 applications in Vadodara since January 2022 are in the same category (Power): 5 approved, 6 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.4 acres, this one is larger than 80% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gavasad, Padra, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed, 250 m away
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed, 2.2 km away
- Diversion of Forest Area – 0.0960 Ha. User Agency's Jafarpara Village Solar… — more information requested, 2.3 km away
- Mining project by Milestone Preservatives Pvt. Ltd — initial checks, 2.5 km away
- Proposed Expansion in production capacity of Synthetic Organic Chemicals (API… — under environmental review, 3.1 km away
- Proposed Expansion in production capacity of Synthetic Organic Chemicals (API… — returned to applicant, 3.1 km away
- Proposed Expansion in production capacity of Synthetic Organic Chemicals (API… — cleared for impact study, 3.1 km away
- 0.1274 Ha. Of Protected Forest Land For the Under Construction of 66 KV S/C,… — forest land use approved, 3.4 km away
More from Kpi Green Energy Limited in Vadodara
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed
- FCA Application for laying 33 KV 6 Nos Transmission line underground parallel… — lapsed
- Diversion of Forest Area – 0.0960 Ha. User Agency's Jafarpara Village Solar… — more information requested
- To set up ground-mounted panels Solar Park in Jambusar Taluka — more information requested
5 Kpi Green Energy projects in Vadodara
All 37 Kpi Green Energy projects across India