In-principle approval, conditions pendingWater & irrigation · Dohad, Gujarat

Diversion of 3.4508 Ha Reserved Forest land for the Underground water Pipeline Project of Kadana dam bulk Pipeline based Zalod South Regional Water Supply Scheme under Jal Jeevan Mission Program for Construction of Water Pipeline / Tank of Tadagola Sharda, Sabli, Jana Chakaliya, Mundaheda, Kotda, Dharadungar, Piplet & Vagela Villages

Diversion of 3.4508 Ha Reserved Forest land for the Underground water Pipeline Project of Kadana dam bulk Pipeline based Zalod South Regional Water Supply Scheme under Jal Jeevan Mission Program for Construction of Water Pipeline / Tank of Tadagola Sharda, Sabli, Jana Chakaliya, Mundaheda, Kotda, Dharadungar, Piplet & Vagela Villages is a proposed water and irrigation project in Kharoda, Dohad, Gujarat. The site covers 8.5 acres. Its stated project cost is ₹79.1 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 11 Sept 2026).

See it on the live map All projects in Dohad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleDiversion of 3.4508 Ha Reserved Forest land for the Underground water Pipeline Project of Kadana dam bulk Pipeline based Zalod South Regional Water Supply Scheme under Jal Jeevan Mission Program for Construction of Water Pipeline / Tank of Tadagola Sharda, Sabli, Jana Chakaliya, Mundaheda, Kotda, Dharadungar, Piplet & Vagela Villages in Jhalod Taluka and Kharoda Village in Dahod Taluka of Dahod District of Gujarat State.
StatusIn-principle approval, conditions pending
Status since11 Sept 2026
Application filed15 Jul 2023
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantExecutive Engineer,gwssb,dahod
Land area8.5 acres (3.5 ha)
Forest land8.5 acres (3.5 ha)
Project cost₹79.1 crore
Village / localityKharoda
Taluk / tehsilDohad
DistrictDohad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13170

In context

13 applications in Dohad since January 2022 are in the same category (Water & irrigation): 8 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2.4 years from filing to approval. At 8.5 acres, this one is larger than 85% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kharoda, Dohad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.