Project details
| Official title | Diversion of 3.4508 Ha Reserved Forest land for the Underground water Pipeline Project of Kadana dam bulk Pipeline based Zalod South Regional Water Supply Scheme under Jal Jeevan Mission Program for Construction of Water Pipeline / Tank of Tadagola Sharda, Sabli, Jana Chakaliya, Mundaheda, Kotda, Dharadungar, Piplet & Vagela Villages in Jhalod Taluka and Kharoda Village in Dahod Taluka of Dahod District of Gujarat State. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 11 Sept 2026 |
| Application filed | 15 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer,gwssb,dahod |
| Land area | 8.5 acres (3.5 ha) |
| Forest land | 8.5 acres (3.5 ha) |
| Project cost | ₹79.1 crore |
| Village / locality | Kharoda |
| Taluk / tehsil | Dohad |
| District | Dohad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13170 |
In context
13 applications in Dohad since January 2022 are in the same category (Water & irrigation): 8 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2.4 years from filing to approval. At 8.5 acres, this one is larger than 85% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharoda, Dohad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 2.60418 Ha Reserved Forest land for the Underground Water… — lapsed, 0 m away
- Development of Greenfield Airport at Dahod — under forest review, 6.4 km away
- Shri Sangada Margi Chirangkumar — environmental approval granted, 12.3 km away
- Request for Diversion of 0.0080 Ha Protected Forest Land for Installation of… — more information requested, 13.8 km away
- Diversion of Protected Forest Land for Widening of existing Dahod Link Road in… — more information requested, 14.6 km away
- Ninama Minaben Ratnabhai — environmental approval granted, 15.3 km away
- Rameshbhai Hemabhai Beravat (Re-Appraisal) Lease Area-1.00.00 Ha. Vill:… — not approved, 15.6 km away
- Sutharvasa Block 2 — lapsed, 15.9 km away
More from Executive Engineer,gwssb,dahod in Dohad
- Proposal of Reserved Forest Land for Construction U/G Sump, Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction U/G Water Pipeline, Sump,… — more information requested
- Proposal of Reserved Forest for Construction U/G Water Pipeline, Sump of… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.