Quick answers
What is this project?
Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side in various villages in Dharampur Taluka is a proposed telecom project in Avdha, Dharampur, Valsad, Gujarat. The site covers 2.3 acres.
Who is building it?
The applicant is Mohammad Irfan Shaikh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Avdha, Dharampur, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹1 crore; a site of 2.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 17 Aug 2024.
Project details
| Official title | Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel) Underground Optical fiber cable Line Along the Road side in various villages in Dharampur Taluka in Valsad District in Gujarat State |
|---|---|
| Status | More information requested |
| Status since | 29 Apr 2026 |
| Application filed | 17 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mohammad Irfan Shaikh |
| Land area | 2.3 acres (0.9 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹1 crore |
| Village / locality | Avdha |
| Taluk / tehsil | Dharampur |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13178 |
In context
11 applications in Valsad since January 2022 are in the same category (Telecom): 1 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. At 2.3 acres, this one is larger than 82% of them.
Where it is
Avdha, Dharampur, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 5.6 km away
- Dharampur Pumped Storage Project of Capacity 1500 MW — returned to applicant, 6.6 km away
- Shri Mahdubhai Kakadbhai Jajar, Re-appraisal of Environment Clearance granted… — lapsed, 7.2 km away
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 7.2 km away
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 7.3 km away
- Sand Quarry Mining — lapsed, 8 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — under forest review, 8 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — lapsed, 8 km away
More from Mohammad Irfan Shaikh in Valsad
- Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel)… — lapsed
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — more information requested
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.