What is Pindval Pumped Storage Project (1000 MW)?
Pindval Pumped Storage Project (1000 MW) is a proposed water and irrigation project in Pindval, Dharampur, Valsad, Gujarat. The site covers 686.4 acres.
Who is building it?
The applicant is Torrent Power Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Sept 2026), as of 27 Nov 2026.
Where is it?
In Pindval, Dharampur, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹4,206.6 crore and a site of 686.4 acres.
When was it filed?
The application was filed on 25 Aug 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Sept 2026 |
| Application filed | 25 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Torrent Power Limited |
| Land area | 686.4 acres (277.8 ha) |
| Project cost | ₹4,206.6 crore |
| Village / locality | Pindval |
| Taluk / tehsil | Dharampur |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11812 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 25 Aug 2026 (this page) | Cleared for impact study | 686.4 acres | ₹4,206.6 crore |
| Early planning filed 23 May 2023 | Cleared for impact study | 1,023 acres | ₹4,206.6 crore |
In context
9 applications in Valsad since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pindval, Dharampur, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pindval Pumped Storage Project (1000 MW) — cleared for impact study, 150 m away
- Dharampur Pumped Storage Project of Capacity 1500 MW — returned to applicant, 1.3 km away
- North Valsad 4G Sat USO — lapsed, 5.9 km away
- North Valsad 4G Sat USOF — more information requested, 5.9 km away
- Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel)… — more information requested, 7.2 km away
- Proposal Protected Forest Land for Bharti Airtel Limited (Airtel) Underground… — lapsed, 9.2 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — under forest review, 9.8 km away
- Diversion of Reserve Forest Land for Widening of Dhamni - Tokarpada Road (MDR)… — lapsed, 9.8 km away
More from Torrent Power Limited in Valsad
- Tokarpada Pumped Storage Project — cleared for impact study
- Tokarpada Pumped Storage Hydroelectric Project (1300 MW) — returned to applicant
4 Torrent Power projects in Valsad
All 28 Torrent Power projects across India