What is Developing? Open the mapMap

LapsedTelecom · Tapi, Gujarat

Approval to Laying Optical Fiber Cables on the Road Side on the Golan to Mandvi Road in Surat and Vyara Districts

Approval to Laying Optical Fiber Cables on the Road Side on the Golan to Mandvi Road in Surat and Vyara Districts is a lapsed telecom project in Bedkuva Dur, Vyara, Tapi, Gujarat. The site covers 1.9 acres. Its stated project cost is ₹2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 Mar 2025).

See it on the live map All projects in Tapi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Approval to Laying Optical Fiber Cables on the Road Side on the Golan to Mandvi Road in Surat and Vyara Districts is a lapsed telecom project in Bedkuva Dur, Vyara, Tapi, Gujarat. The site covers 1.9 acres.

Who is building it?

The applicant is Bharti Airtel Limited.

Has it been approved?

No. The application was lapsed on 2 Mar 2025, so it is no longer under consideration.

Where is it?

In Bedkuva Dur, Vyara, Tapi, Gujarat.

How big is it?

It has a stated cost of ₹2 crore; a site of 1.9 acres and 1.9 acres (0.8 ha) of forest land.

When was it filed?

The application was filed on 24 Jan 2025.

Project details

Official titleProposal for Approval to Laying Optical Fiber Cables on the Road Side on the Golan to Mandvi Road in Surat and Vyara Districts.
StatusLapsed
Status since2 Mar 2025
Application filed24 Jan 2025
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantBharti Airtel Limited
Land area1.9 acres (0.8 ha)
Forest land1.9 acres (0.8 ha)
Project cost₹2 crore
Village / localityBedkuva Dur
Taluk / tehsilVyara
DistrictTapi
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13206

In context

24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.9 acres, this one is larger than 67% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bedkuva Dur, Vyara, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharti Airtel Limited in Tapi

4 Bharti Airtel (Airtel) projects in Tapi
All 485 Bharti Airtel (Airtel) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.