Quick answers
What is this project?
Laying Optical Fiber Cables on the Road Side on the Golan to Mandvi Road in Surat and Vyara Districts. Protected Forest: -(Length: - 31763 Meter, Width: - 0.45 Meter, Area: - 1.4293 Ha) is a lapsed telecom project in Medha, Songadh, Tapi, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 26 Feb 2025, so it is no longer under consideration.
Where is it?
In Medha, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹2 crore; a site of 4.9 acres and 3.5 acres (1.4 ha) of forest land.
When was it filed?
The application was filed on 24 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Feb 2025 |
| Application filed | 24 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 4.9 acres (2 ha) |
| Forest land | 3.5 acres (1.4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Medha |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12785 |
In context
24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 4.9 acres, this one is larger than 76% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Medha, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- From Temka to Songadh Total Length 15/630 Kms I.E. 0.70 Ha. — lapsed, 2.7 km away
- Tapi 4G Sat USOF VVIP Cases — forest land use approved, 3.2 km away
- Rashikbhai Thaganiabhai Gamit Re-appraisal Area-1.00.00 Survey no. – Opp. 1,… — lapsed, 8.1 km away
- Approval to Laying Optical Fiber Cables on the Road Side on the Golan to… — lapsed, 8.6 km away
- Diversion of 2.2498 Hectare of Protected Forest Land I.E. Road Side Strip… — forest land use approved, 8.7 km away
- M/s Giriraj Stone Quarry Re-appraisal Area-1.18.00 Survey no. - 140, Block no.… — environmental approval granted, 8.7 km away
- Diversion of 2.2100 Hectare of Reserve Forest Land I.E. Village Forest… — lapsed, 9.3 km away
- Dhamodi to Galkuva to Bandarpada to Ghodchit to Maiyali to Sandhkuva to… — lapsed, 9.7 km away
More from Bharti Airtel Limited in Tapi
- Divrsion of Protected Forest Land for laying of OFC Cable from Uchchhal Nizar… — lapsed
- Approval to Laying Optical Fiber Cables on the Road Side on the Golan to… — lapsed
- Diversion of Forest Land 2.1463ha for Jakhvav to Selamba to Akkalkuva OFC… — more information requested
4 Bharti Airtel (Airtel) projects in Tapi
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.