Quick answers
What is this project?
Diversion of Forest Land of 0.4599 Hac. for forest clearance for Laying of 220 KV Under Ground cable line with 1200 sq.mm. XLPE Power cable from 220KV Navsari Substation to 220 KV M/S SANGAM SOLAR ONE PVT. LTD. Substation for Requirement of 17000 KVA EHT power supply at 220 KV system voltage in respect of M/S SANGAM SOLAR ONE PVT. LTD. proposed unit to be located at City Survey No. NA175, NA176 & NA 181, Near Uday Palace, Village. Unn, Ta. Navsari, Di-Navsari. with 1C X 1200 Sq.mm. (3+0) XLPE ca is an approved power project in Un, Navsari, Gujarat. The site covers 1.1 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 Jul 2026), as of 27 Nov 2026.
Where is it?
In Un, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹20 crore; a site of 1.1 acres and 1.1 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 21 Dec 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 4 Jul 2026 |
| Application filed | 21 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹20 crore |
| Village / locality | Un |
| Taluk / tehsil | Navsari |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13287 |
In context
11 applications in Navsari since January 2022 are in the same category (Power): 5 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 1.1 acres, this one is smaller than 73% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Un, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission of Forest land proposal for diversion of Protected Forest Land of… — lapsed, 50 m away
- Proposed project Work shop for Ushaben Alpeshkumar Shah — withdrawn, 750 m away
- 90 mm dia. PE Network Extension Required for Nutritious Foods Mataji Chikki… — forest land use approved, 900 m away
- Diversion of 0.0768 ha Protected forest land for Approach road for Entry and… — forest land use approved, 1.4 km away
- Permission for Diversion of 0.0180 ha Protected forest land for Approach road… — forest land use approved, 1.4 km away
- Diversion of 0.0413 ha Protected forest land for Approach road for… — lapsed, 1.5 km away
- Diversion of 0.0766 ha Protected forest land for Approach road for Entry and… — forest land use approved, 1.6 km away
- Proposed New Project of Synthetic Organic Chemicals (Polyester Resin, Epoxy… — environmental approval granted, 1.6 km away
More from Gujarat Energy Transmission Corp LTD in Navsari
- 220KV Ambheta Waaree UG Cable Line — forest land use approved
- Submission of Forest land proposal for diversion of Protected Forest Land of… — lapsed
- Forest land proposal for diversion of Forest Land of 12.2290 Hac. for forest… — forest land use approved
- Forest land proposal for diversion of Forest Land of 14.9835 Hac. for forest… — in-principle approval, conditions pending
- 220 KV Talanpur - Vav & 220 KV Talngpur-Navsari LILO at 765 KV New Navsari… — under forest review
- 66KV Dhanori Line — lapsed
7 Gujarat Energy Transmission Corp projects in Navsari
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.