Quick answers
What is 220KV Ambheta Waaree UG Cable Line?
220KV Ambheta Waaree UG Cable Line is an approved power project in Thala, Chikhli, Navsari, Gujarat. The site covers 0.9 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Jun 2026), as of 27 Nov 2026.
Where is it?
In Thala, Chikhli, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹91.7 crore; a site of 0.9 acres and 3,750 m² of forest land.
When was it filed?
The application was filed on 30 Jul 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Jun 2026 |
| Application filed | 30 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 3,700 m² |
| Forest land | 3,750 m² |
| Project cost | ₹91.7 crore |
| Village / locality | Thala |
| Taluk / tehsil | Chikhli |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13989 |
In context
11 applications in Navsari since January 2022 are in the same category (Power): 5 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.9 acres, this one is smaller than 91% of them.
88 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thala, Chikhli, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Alipore Blacktrap Mining Project, Survey No. 2136 Paiki, Proposed by M/s.… — lapsed, 1.9 km away
- Alipore Blacktrap Mining Project, Survey No. 2136 Paiki, Proposed by M/s.… — lapsed, 1.9 km away
- Alipore Metal Work (SALIM RASUL DIWAN) — withdrawn, 2 km away
- Alipore Blacktrap Mining Project, S. No. 724 Paiki — lapsed, 2 km away
- Diversion of 0.063 Ha. Protected Forest Land to Lay Optical Fiber Cable Along… — lapsed, 2.1 km away
- Alipore Blacktrap Mining Project, Survey no. 2116,2121, Proposed by Shri… — environmental approval granted, 2.2 km away
- Alipore Blacktrap Mining Project, Survey No. 2087 Paiki, Proposed by M/S… — environmental approval granted, 2.4 km away
- Alipore Blacktrap Mining Project, Survey No. 818P, Proposed by M/s. Fraidaben… — environmental approval granted, 2.5 km away
More from Gujarat Energy Transmission Corp LTD in Navsari
- Diversion of Forest Land of 0.4599 Hac. for forest clearance for Laying of 220… — forest land use approved
- Submission of Forest land proposal for diversion of Protected Forest Land of… — lapsed
- Forest land proposal for diversion of Forest Land of 12.2290 Hac. for forest… — forest land use approved
- Forest land proposal for diversion of Forest Land of 14.9835 Hac. for forest… — in-principle approval, conditions pending
- 220 KV Talanpur - Vav & 220 KV Talngpur-Navsari LILO at 765 KV New Navsari… — under forest review
- 66KV Dhanori Line — lapsed
7 Gujarat Energy Transmission Corp projects in Navsari
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.