What is From Temka to Songadh Total Length 15/630 Kms I.E. 0.70 Ha.?
From Temka to Songadh Total Length 15/630 Kms I.E. 0.70 Ha is a lapsed telecom project in Raniamba, Songadh, Tapi, Gujarat. The site covers 1.7 acres.
Who is building it?
The applicant is Vodafone Idea Telecom Infrastructure Limited.
Has it been approved?
No. The application was lapsed on 27 Jan 2026, so it is no longer under consideration.
Where is it?
In Raniamba, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹16 lakh; a site of 1.7 acres and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Jan 2026 |
| Application filed | 3 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vodafone Idea Telecom Infrastructure Limited |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Raniamba |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13372 |
In context
24 applications in Tapi since January 2022 are in the same category (Telecom): 9 approved, 4 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.7 acres, this one is larger than 57% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raniamba, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying Optical Fiber Cables on the Road Side on the Golan to Mandvi Road in… — lapsed, 2.7 km away
- Tapi 4G Sat USOF VVIP Cases — forest land use approved, 5.5 km away
- M/s Giriraj Stone Quarry Re-appraisal Area-1.18.00 Survey no. - 140, Block no.… — environmental approval granted, 6.2 km away
- Mining project by M/s. Atik Metal Industries — environmental approval granted, 7.6 km away
- Mining project by M/s Atik Metal Industries Re-appraisal Area-4.88.00 Survey… — environmental approval granted, 7.7 km away
- Mining project by M/s. Sagar Stone Industries Reapprasial Area-1.00.004.… — environmental approval granted, 7.7 km away
- M/s Pavan Stone Quarry, Pro. Shri Gaurang Kumar R Shah, Re-appraisal… — environmental approval granted, 7.8 km away
- Mining project by M/s Sagar Stone Industries — under environmental review, 7.9 km away
More from Vodafone Idea Telecom Infrastructure Limited in Tapi
- from (1) Palsana to Ghaluda to Ena to Dhamdod to Vanesa to Isroli Total length… — more information requested
- From Rupwada to Kapura to Magarkui to Saraiya Total Length 14/470 Kms I.E.… — lapsed
- From Allu to Valod to Rupwada Total Length 14/740 Kms I.E. 0.66 Ha. — lapsed
- Dhamodi to Galkuva to Bandarpada to Ghodchit to Maiyali to Sandhkuva to… — lapsed
5 Vodafone Idea Telecom projects in Tapi
All 71 Vodafone Idea Telecom projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.