What is ESSAR Future Energy Limited Connectivity?
ESSAR Future Energy Limited Connectivity is a proposed pipeline project in Kajurda, Khambhalia, Devbhumi Dwarka, Gujarat. The site covers 0.6 acres.
Who is building it?
The applicant is Gspl Transmission Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Kajurda, Khambhalia, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹5 crore; a site of 0.6 acres and 1,520 m² of forest land.
When was it filed?
The application was filed on 14 Oct 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 14 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gspl Transmission Limited |
| Land area | 2,300 m² |
| Forest land | 1,520 m² |
| Project cost | ₹5 crore |
| Village / locality | Kajurda |
| Taluk / tehsil | Khambhalia |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13406 |
In context
10 applications in Devbhumi Dwarka since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kajurda, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — environmental approval granted, 1.2 km away
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — cleared for impact study, 1.2 km away
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — returned to applicant, 1.2 km away
- Expansion of Existing 1200 MW by adding 1600 MW — cleared for impact study, 1.4 km away
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — lapsed, 1.4 km away
- Proposed 1 MMTPA Bio Fuel Complex Located Near Kajurda Village, Taluka… — returned to applicant, 1.4 km away
- Power project by Essar Power Salaya Limited — lapsed, 2.1 km away
- Ghee Group R.W.S.S Augmentation program — lapsed, 3.5 km away
All 5 Gspl Transmission projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.