Quick answers
What is this project?
Proposed "765 kV D/C from Khavda-II PS (GIS) to Lakadia (PS) Transmission Line" for proposed 4.5GW Hybrid (Wind-Solar) Park near Rann of Kutch by Adani Transmission Step Three Limited is a lapsed building project in Reldi (Bani), Bhuj, Kachchh, Gujarat. It seeks 593.8 acres of forest land.
Who is building it?
The applicant is Adani Transmission Step-Three Limited.
Has it been approved?
No. The application was lapsed on 7 Feb 2023, so it is no longer under consideration.
Where is it?
In Reldi (Bani), Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹638.3 crore and 593.8 acres (240.3 ha) of forest land.
When was it filed?
The application was filed on 21 Jan 2023.
Project details
| Official title | Construction of proposed "765 kV D/C from Khavda-II PS (GIS) to Lakadia (PS) Transmission Line" for proposed 4.5GW Hybrid (Wind-Solar) Park near Rann of Kutch at Village Khavda, District Kutch, Gujarat by Adani Transmission Step Three Limited. |
|---|---|
| Status | Lapsed |
| Status since | 7 Feb 2023 |
| Application filed | 21 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Transmission Step-Three Limited |
| Forest land | 593.8 acres (240.3 ha) |
| Project cost | ₹638.3 crore |
| Village / locality | Reldi (Bani) |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13502 |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval.
Where it is
Reldi (Bani), Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power project by Khavda II-A Transmission Limited — decision issued, 7.7 km away
- Power project by Khavda II-A Transmission Limited — forest land use approved, 7.7 km away
- 765 kV D/C KPS3 (GIS) – Lakadia (AIS) Transmission Line for "Evacuation of… — forest land use approved, 14.5 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Mokhana-Chapreli via… — lapsed, 15.5 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Kutch East,… — application filed, 15.5 km away
- 765 kV D/C Transmission Line from Khavda-II PS (GIS) to Halvad for "Evacuation… — decision issued, 15.6 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Kutch East,… — application filed, 16.1 km away
- Tulsidas Karsanji Thacker — environmental approval granted, 16.9 km away
About this information