What is Developing? Open the mapMap

LapsedTelecom · Navsari, Gujarat

Diversion of 0.2800 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable to Various En-Route Villages

Diversion of 0.2800 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable to Various En-Route Villages is a lapsed telecom project in Eroo, Jalalpore, Navsari, Gujarat. The site covers 0.7 acres. Its stated project cost is ₹25 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 5 Apr 2024).

See it on the live map All projects in Navsari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.2800 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable to Various En-Route Villages is a lapsed telecom project in Eroo, Jalalpore, Navsari, Gujarat. The site covers 0.7 acres.

Who is building it?

The applicant is Dipak Gamit.

Has it been approved?

No. The application was lapsed on 5 Apr 2024, so it is no longer under consideration.

Where is it?

In Eroo, Jalalpore, Navsari, Gujarat.

How big is it?

It has a stated cost of ₹25 lakh; a site of 0.7 acres and 2,800 m² of forest land.

When was it filed?

The application was filed on 6 Jan 2024.

Project details

Official titleDiversion of 0.2800 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable to Various En-Route Villages in Taluka Jalalpore of District Navsari.
StatusLapsed
Status since5 Apr 2024
Application filed6 Jan 2024
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantDipak Gamit
Land area2,800 m²
Forest land2,800 m²
Project cost₹25 lakh
Village / localityEroo
Taluk / tehsilJalalpore
DistrictNavsari
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13509

In context

6 applications in Navsari since January 2022 are in the same category (Telecom): 1 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Eroo, Jalalpore, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dipak Gamit in Navsari

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.