What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Navsari, Gujarat

Permission for Diversion of 0.0714 ha Protected forest land for Approach road for Construction of Prabhakunj Swarg Residency Parallel to Eru-Hasapor-Abrama-Amalsad-Bilimora Coastal State Highway of Taluka Jalalpore

Permission for Diversion of 0.0714 ha Protected forest land for Approach road for Construction of Prabhakunj Swarg Residency Parallel to Eru-Hasapor-Abrama-Amalsad-Bilimora Coastal State Highway of Taluka Jalalpore is an approved road project in Abrama, Jalalpore, Navsari, Gujarat. The site covers 0.2 acres. Its stated project cost is ₹4.5 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 17 Apr 2026).

See it on the live map All projects in Navsari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Permission for Diversion of 0.0714 ha Protected forest land for Approach road for Construction of Prabhakunj Swarg Residency Parallel to Eru-Hasapor-Abrama-Amalsad-Bilimora Coastal State Highway of Taluka Jalalpore is an approved road project in Abrama, Jalalpore, Navsari, Gujarat. The site covers 0.2 acres.

Who is building it?

The applicant is Dipak Gamit.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.

Where is it?

In Abrama, Jalalpore, Navsari, Gujarat.

How big is it?

It has a stated cost of ₹4.5 crore; a site of 0.2 acres and 710 m² of forest land.

When was it filed?

The application was filed on 28 May 2025.

Project details

Official titlePermission for Diversion of 0.0714 ha Protected forest land for Approach road for Construction of Prabhakunj Swarg Residency Parallel to Eru-Hasapor-Abrama-Amalsad-Bilimora Coastal State Highway of Taluka Jalalpore in District Navsari of State Gujarat.
StatusForest land use approved
Status since17 Apr 2026
Application filed28 May 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantDipak Gamit
Land area700 m²
Forest land710 m²
Project cost₹4.5 crore
Village / localityAbrama
Taluk / tehsilJalalpore
DistrictNavsari
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12355

In context

38 applications in Navsari since January 2022 are in the same category (Roads & highways): 20 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.2 acres, this one is smaller than 64% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Abrama, Jalalpore, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dipak Gamit in Navsari

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.