Project details
| Official title | Construction of proposed "765 kV D/C Transmission Line from Ahmedabad PS to Navsari PS " for proposed 4.5 GW Hybrid (Wind Solar) Park near Rann of Kutch at village Khavda, District Kutch, Gujarat by Adani Transmission Step Five Limited. |
|---|---|
| Status | Lapsed |
| Status since | 4 Mar 2023 |
| Application filed | 1 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Transmission Step-Five Limited |
| Forest land | 69.5 acres (28.1 ha) |
| Project cost | ₹1,024 crore |
| Village / locality | Girand |
| Taluk / tehsil | Dholka |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13526 |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
Where it is
Girand, Dholka, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Offshore Oil and Gas Exploration, Appraisal and Testing Unit for the… — recommended by coastal authority, 45.3 km away
- Offshore Oil and Gas Exploration, Appraisal and Testing Unit for the… — environmental approval granted, 45.3 km away
- Proposed 50 MLD Sea Water Desalination Plant — coastal clearance granted, 59.4 km away
- Proposed RO Reject Disposal Pipeline for discharge of 12 MLD RO reject from 60… — under coastal review, 65.8 km away
- Dholera Iconic — environmental approval granted, 70.5 km away
- Dholera Special Investment Region (DSIR) In Gujarat by M/s. Dholera Special… — under environmental review, 71.1 km away
- Dholera Special Investment Region (DSIR) - Regarding Validity Extension of… — environmental approval granted, 71.1 km away
- Environment Clearance for proposed Factory Building construction project for… — initial checks, 72.8 km away
All 5 Adani Transmission Step-Five projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.