What is Developing? Open the mapMap

Initial checksBuildings & townships · Ahmadabad, Gujarat

Environment Clearance for proposed Factory Building construction project for setting up 4 GW Solar PV Cells(Topcon) by Renew Photovoltaics Pvt. Ltd.

Environment Clearance for proposed Factory Building construction project for setting up 4 GW Solar PV Cells(Topcon) by Renew Photovoltaics Pvt. Ltd is a proposed industrial building project in Dholera, Ahmadabad, Gujarat. It plans 4 towers on 19.6 acres. Its stated project cost is ₹2,265.7 crore. As of 27 Nov 2026, its status is “Initial checks” (since 6 Oct 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance for proposed Factory Building construction project for setting up…

Project details

StatusInitial checks
Status since6 Oct 2026
Application filed6 Oct 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorBuildings & townships
ApplicantRenew Photovoltaics Private Limited
UseIndustrial
Towers4
Height18 m
Parking spaces820
Land area19.6 acres (7.9 ha)
Built-up area1,49,118 m² (16,05,091 sq ft)
Plot area1,49,118 m² (16,05,091 sq ft)
Project cost₹2,265.7 crore
Village / localityDholera
Taluk / tehsilDholera
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-10532

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 6 Oct 2026 (this page)Initial checks19.6 acres₹2,265.7 crore
New project filed 16 Jul 2025Environmental approval granted102 acres₹2,265.7 crore

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.6 acres, this one is larger than 93% of them.

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dholera, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Blueparrot Data Centre: 813 MW Data Centre Building Project in Dholera, Gujarat (2.3 km away).

Other projects nearby

All 3 Renew Photovoltaics projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.