Quick answers
What is Nana Chiloda to Mota Chiloda Pipeline Connectivity?
Nana Chiloda to Mota Chiloda Pipeline Connectivity is an approved pipeline project in Valad, Gandhinagar, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Sabarmati Gas LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 May 2026), as of 27 Nov 2026.
Where is it?
In Valad, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹5 crore; a site of 1.5 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 1 May 2026 |
| Application filed | 21 Apr 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Sabarmati Gas LTD |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹5 crore |
| Village / locality | Valad |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13535 |
In context
23 applications in Gandhinagar since January 2022 are in the same category (Pipelines): 8 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2.5 years from filing to approval. At 1.5 acres, this one is larger than 78% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Valad, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 125/90/63 mm Dia MDPE along and across on NH 48 near villages near… — more information requested, 2 km away
- Building project by Gujarat International Finance Tec-City Company Limited — environmental approval granted, 2.1 km away
- Gujarat Biotechnology University, Gift City, Gandhinagar, Gujarat — lapsed, 2.7 km away
- Gujarat Biotechnology University, Gift City, Gandhinagar, Gujarat — withdrawn, 2.7 km away
- The Front — environmental approval granted, 3.4 km away
- Beyond — initial checks, 3.6 km away
- Staylab — under environmental review, 4 km away
- Foresta — more information requested, 4.3 km away
More from Sabarmati Gas LTD in Gandhinagar
- Laying of 4" Dia Steel Gas Pipeline For Arbuda Fuel Station — lapsed
- Laying of 4" Dia Steel Gas Pipeline for V and V Company CNG Connectivity at… — initial checks
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — more information requested
- Shree Swaminarayan Petroleum CNG Station Connectivity at Ambod — lapsed
- Gandhinagar Steel Network Redundancy Plan Connectivity — lapsed
- 6" Steel Gas Pipeline connectivity for For Om Petroleum, Dehgam Ta:Dehgam,… — forest land use approved
13 Sabarmati Gas projects in Gandhinagar
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.