Quick answers
What is this project?
Laying of 4" Dia Steel Gas Pipeline for V and V Company CNG Connectivity at Pethapur, Gandhinagar District is a proposed pipeline project in Pethapur, Gandhinagar, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Sabarmati Gas LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Pethapur, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹2 crore; a site of 0.3 acres and 1,330 m² of forest land.
When was it filed?
The application was filed on 17 Jul 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 6 Oct 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sabarmati Gas LTD |
| Land area | 1,300 m² |
| Forest land | 1,330 m² |
| Project cost | ₹2 crore |
| Village / locality | Pethapur |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14050 |
In context
23 applications in Gandhinagar since January 2022 are in the same category (Pipelines): 8 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2.5 years from filing to approval. At 0.3 acres, this one is smaller than 67% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pethapur, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vrundavan Sky View — environmental approval granted, 1.6 km away
- Vanzara Dalaji Fojaji — environmental approval granted, 2.2 km away
- Shri Kaluji fofaji Vanzara Re-Appraisal for Mining of River bed ordinary sand,… — environmental approval granted, 2.3 km away
- Shri Javanji Naraji Vanzara Re-Appraisal for Mining of River bed ordinary… — environmental approval granted, 2.3 km away
- Shri Javanji Naraji Vanzara Re-Appraisal for Mining of River bed ordinary… — environmental approval granted, 2.4 km away
- Shri Javanji Naraji Vanzara Re-Appraisal for Mining of River bed ordinary… — environmental approval granted, 2.4 km away
- Spring City — environmental approval granted, 2.4 km away
- Shri Vishnuji Naraji Vanzara Re-Appraisal for Mining of River bed ordinary… — lapsed, 2.5 km away
More from Sabarmati Gas LTD in Gandhinagar
- Laying of 4" Dia Steel Gas Pipeline For Arbuda Fuel Station — lapsed
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — more information requested
- Shree Swaminarayan Petroleum CNG Station Connectivity at Ambod — lapsed
- Nana Chiloda to Mota Chiloda Pipeline Connectivity — forest land use approved
- Gandhinagar Steel Network Redundancy Plan Connectivity — lapsed
- 6" Steel Gas Pipeline connectivity for For Om Petroleum, Dehgam Ta:Dehgam,… — forest land use approved
13 Sabarmati Gas projects in Gandhinagar
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.