Quick answers
What is this project?
Palsana to Ghaluda to Ena to Dhamdod to Vanesa to Isroli Total length 16/145 KMS i.e. 0.73 ha is a lapsed telecom project in Vanesa, Palsana, Surat, Gujarat. The site covers 1.8 acres.
Who is building it?
The applicant is Vodafone Idea Telecom Infrastructure Limited.
Has it been approved?
No. The application was lapsed on 5 Feb 2026, so it is no longer under consideration.
Where is it?
In Vanesa, Palsana, Surat, Gujarat.
How big is it?
It has a stated cost of ₹17 lakh; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 Feb 2026 |
| Application filed | 3 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vodafone Idea Telecom Infrastructure Limited |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Vanesa |
| Taluk / tehsil | Palsana |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13579 |
In context
20 applications in Surat since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 15 withdrawn, lapsed or rejected. At 1.8 acres, this one is larger than 89% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vanesa, Palsana, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion Of 0.39 Hectare Protected Forest Land To Construct An Approach… — under forest review, 1.2 km away
- 1)125 Mm Dia Pipeline for Afva Village Connectivity Taluka Bardoli 2) 4" Inch… — forest land use approved, 2.7 km away
- Diversion of 0.0123 Ha. of PF Land for laying of 125 mm PE Pipeline Network to… — more information requested, 4 km away
- Diversion of 1.6175 Ha Protected forest land for the work of Construction of… — more information requested, 5 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — environmental approval granted, 5.4 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — environmental approval granted, 5.4 km away
- Proposed Capacity Expansion of Sugar Manufacturing Unit due to Modernization… — more information requested, 5.4 km away
- Diversion of 0.0011 Hectare of Protected Forest land for laying of Proposed… — forest land use approved, 6.3 km away
More from Vodafone Idea Telecom Infrastructure Limited in Surat
- Bardoli to Afva to Gotasa to Sarethi to Vankaner to Allu Total length 9/330… — lapsed
- Diversion of 0.9760 Ha Protected Forest Land for laying Optical fiber cable… — lapsed
- Diversion of 0.6598 ha. Protected Forest land for the grant permission for… — lapsed
- Diversion of 0.1856 ha. Protected Forest land for the grant permission for… — lapsed
5 Vodafone Idea Telecom projects in Surat
All 71 Vodafone Idea Telecom projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.