Quick answers
What is this project?
Diversion of Forest Land for Laying of Underground Water Pipeline and Construction of Sump is an approved pipeline project in Dagala, Bhuj, Kachchh, Gujarat. The site covers 2 acres.
Who is building it?
The applicant is Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Jun 2026), as of 27 Nov 2026.
Where is it?
In Dagala, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1.3 crore; a site of 2 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 27 Aug 2024.
Project details
| Official title | Diversion of Forest Land for Laying of Underground Water Pipeline and Construction of Sump in Village: Modsar, Ta: Bhuj, Dist: Kachchh |
|---|---|
| Status | Forest land use approved |
| Status since | 25 Jun 2026 |
| Application filed | 27 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya |
| Land area | 2 acres (0.8 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Dagala |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13603 |
In context
59 applications in Kachchh since January 2022 are in the same category (Pipelines): 21 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2 acres, this one is larger than 54% of them.
100 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dagala, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Ramesh Mavji Gagal. Modsar — under environmental review, 900 m away
- Makwana Poonambhai Parbat Bhai (1.61.00 Hect.) — initial checks, 950 m away
- Makwana Poonambhai Parbat Bhai (1.61.00 Hect.) — cleared for impact study, 950 m away
- Shri Varchand Budha Bhura. — environmental approval granted, 950 m away
- Shri Ramesh Mavji Gagal — environmental approval granted, 1000 m away
- Construction of Approach Road Passing Through the Forest Area — lapsed, 1.1 km away
- Shri Dipak Naran mata — environmental approval granted, 1.1 km away
- Shri Dipak Naran mata — cleared for impact study, 1.1 km away
More from Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya in Kachchh
- Diversion of Forest land of Village: Laiyari( Ta: Abdasa) and Village: Maniara… — more information requested
- Diversion of 0.3490 Ha Forest Land of Naliya Narayansarovar Road for Laying of… — more information requested
- Diversion of 0.4627 Ha Forest land of Naliya Narayansarovar Road for laying of… — more information requested
- Diversion of Forest land for the laying of Proposed Underground Water Pipeline… — forest land use approved
- Laying of Underground Water Pipeline to Roadside Forest of Bhuj Khavada Road — more information requested
- Laying of Underground Drinking Water Pipeline Through the Roadside Protected… — more information requested
All 28 Gujarat Water Supply & Sewerage Board, P.H..S Sub Dn. No.1 Naliya projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.