Forest land use approvedPower · Bharuch, Gujarat

Set Up Solar Park at Netrang and to Lay Transmission Power Line From Solar Park to Getco Netran. Fca Approval for Area 0.0715 Ha

Set Up Solar Park at Netrang and to Lay Transmission Power Line From Solar Park to Getco Netran. Fca Approval for Area 0.0715 Ha is an approved power project in Fokdi, Netrang, Bharuch, Gujarat. The site covers 0.2 acres. Its stated project cost is ₹14 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 10 Jul 2026).

See it on the live map All projects in Bharuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since10 Jul 2026
Application filed12 May 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantSun Drops Energia Private Limited
Land area700 m²
Forest land720 m²
Project cost₹14 lakh
Village / localityFokdi
Taluk / tehsilNetrang
DistrictBharuch
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13614

In context

51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 90% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Fokdi, Netrang, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.