Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Sept 2025 |
| Application filed | 11 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 900 m² |
| Forest land | 900 m² |
| Project cost | ₹14 lakh |
| Village / locality | Netrang |
| Taluk / tehsil | Netrang |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14151 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.2 acres, this one is smaller than 80% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Netrang, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- FCA proposal: to lay 3-nos - 11 KV Electrical Transmission Line underground on… — forest land use approved, 0 m away
- Set Up Solar Park at Netrang and to Lay Transmission Power Line From Solar… — forest land use approved, 100 m away
- Laying 11KV - Two (2-Nos.) Power Cable Transmission Line on SH-163… — forest land use approved, 500 m away
- Mining project by M/s Dilip Buildcon Limited — lapsed, 1.3 km away
- Shri Kantibhai Virjibhai Chotliya Re-appraisal Area-1.00.00 Survey no. - 28 B… — environmental approval granted, 1.3 km away
- Shri Kantilal Virjibhai Chotaliya Reapprasial Area1.00.00Village – Fokadi,… — environmental approval granted, 1.4 km away
- 4 laning from Dahod-Vapi Section of NH-56 in Gujarat PKG V Movi to Kavachia… — forest land use approved, 4.5 km away
- 4 laning from Dahod-Vapi Section of NH-56 in Gujarat PKG V Movi to Kavachia… — lapsed, 4.5 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- Diversion of Forest Area – 0.0840 Ha. Permission for laying 33 KV 5-nos.… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.