Quick answers
What is this project?
Laying of Underground Optical Fiber Cable From Naliya to Narayansarovar Road (Naliaya to Sukhpar) Abdasa Block-1 Project is an approved telecom project in Chhadura, Abdasa, Kachchh, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Mohammad Irfan Shaikh.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Apr 2026), as of 27 Nov 2026.
Where is it?
In Chhadura, Abdasa, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 1.5 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 14 Aug 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 14 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mohammad Irfan Shaikh |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Chhadura |
| Taluk / tehsil | Abdasa |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13626 |
In context
46 applications in Kachchh since January 2022 are in the same category (Telecom): 11 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.5 acres, this one is larger than 75% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhadura, Abdasa, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Naliya Vayor Ofc Route Rehabilation Work of Bsnl Kutch Bhuj — forest land use approved, 850 m away
- Diversion of 0.3490 Ha Forest Land of Naliya Narayansarovar Road for Laying of… — more information requested, 3.2 km away
- Diversion of Forest Land to Construct of Approach Road and Laying of… — forest land use approved, 4 km away
- Naliya Vayor Ofc Route Rehabilation Work — lapsed, 6.7 km away
- Widening/Upgradation to 2 Lanes With Paved Shoulder From Km 221/800 to Km… — more information requested, 7.9 km away
- Project by National Highway Division Gandhidham — not approved, 7.9 km away
- Diversion of 0.4627 Ha Forest land of Naliya Narayansarovar Road for laying of… — more information requested, 9.1 km away
- Kothara Chokdi to Naliya Chokdi — lapsed, 9.5 km away
More from Mohammad Irfan Shaikh in Kachchh
- Proposed Roadside Protected Forest land of Naliya to Dumara Village — forest land use approved
- Proposed Road side Protected Forest land of Naliya to Dumara Village — lapsed
- Kothara Chokdi to Naliya Chokdi — lapsed
- Laying of Underground Optical Fiber to the Roadside Protected Forest Land of… — under forest review
- Diversion of 0.5038 Ha. of Reserved Forest Land for grant Permission for… — lapsed
- Diversion of 0.5174 Ha. of Reserved Forest Land for grant Permission for… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.