| Status | Under forest review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 19 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Powergrid West Central Transmission Limited |
| Forest land | 986.8 acres (399.3 ha) |
| Project cost | ₹2,920.2 crore |
| Village / locality | Bhurkhi |
| Taluk / tehsil | Dholka |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13923 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Aug 2026 (this page) | Under forest review | ₹2,920.2 crore | |
| New project filed 3 Jun 2025 | Under wildlife review | 10,277.8 acres | ₹2,920.2 crore |
In context
19 applications in Ahmadabad since January 2022 are in the same category (Power): 10 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.
Where it is
Bhurkhi, Dholka, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 60.8250 Ha. Pf Land for the Project of Four Lane of SH-18… — more information requested, 46.4 km away
- Diversion of 60.8250 ha Protected Forest land for The Project of 7.00 meter to… — lapsed, 46.4 km away
- Diversion of 60.8250 Ha. Pf Land for the Project of Four Lane of SH-18… — lapsed, 46.4 km away
- Lying Underground Optical Fiber Cable from Hansalpur Cross Road to the Limit… — initial checks, 52.1 km away
- Sapphire Heaven — under environmental review, 55.7 km away
- Sapphire Heaven — returned to applicant, 55.7 km away
- Tulsi Villa — environmental approval granted, 56.4 km away
- 125 mm Dia PE Gas Pipeline Connectivity From Vitthlapur To Viramgam City, Ta:… — forest land use approved, 56.9 km away
All 6 Powergrid West Central projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.