One of 2 filings for this project. The project's main page, with every filing and where each stands: ±800 kV HVDC Bipole KPS2-Nagpur Transmission Line
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 3 Jun 2025 |
| Application filed | 3 Jun 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Powergrid West Central Transmission Limited |
| Land area | 10,277.8 acres (4,159.3 ha) |
| Project cost | ₹2,920.2 crore |
| Village / locality | Bhurkhi |
| Taluk / tehsil | Dholka |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14710 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Aug 2026 | Under forest review | ₹2,920.2 crore | |
| New project filed 3 Jun 2025 (this page) | Under wildlife review | 10,277.8 acres | ₹2,920.2 crore |
In context
19 applications in Ahmadabad since January 2022 are in the same category (Power): 10 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 10,277.8 acres, this one is larger than 82% of them.
Where it is
Bhurkhi, Dholka, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wildlife Clearance for diversion of 4.9453 Ha Forest Land for Widening &… — under wildlife review, 28.9 km away
- Love Kush Villa — lapsed, 31.7 km away
- 125 mm Dia MDPE Gas Pipeline For Dhandhuka City Ranpur Road (SH-1) — forest land use approved, 32.7 km away
- 125 mm Dia MDPE Network For Dhandhuka City (Dhandhuka-Baravala Road),… — forest land use approved, 33.6 km away
- 125 mm Dia MDPE Gas Pipeline Connectivity For Dhandhuka City Dholera Road… — forest land use approved, 33.8 km away
- Telecom Network in Fedra – Bagodara Road - SH-01 Diversion of 0.913 ha. of… — forest land use approved, 35.3 km away
- 125 MM Supply Gas to Dhandhuka city for Connect to DRS, Padana Taluka:… — forest land use approved, 35.6 km away
- 8" dia Steel Gas pipeline from Zinzar to Dhandhuka Town — forest land use approved, 36.7 km away
All 6 Powergrid West Central projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.