Quick answers
What is 4G Saturation USOF Kachchh CAT-5/6?
4G Saturation USOF Kachchh CAT-5/6 is a proposed telecom project in Berdo, Bhuj, Kachchh, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Berdo, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹4 crore; a site of 0.1 acres and 600 m² of forest land.
When was it filed?
The application was filed on 9 Aug 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 9 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 600 m² |
| Forest land | 600 m² |
| Project cost | ₹4 crore |
| Village / locality | Berdo |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13972 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Aug 2026 (this page) | Under forest review | 0.1 acres | ₹4 crore |
| New project filed 21 Jul 2026 | Application filed | 0.1 acres | ₹4 crore |
In context
46 applications in Kachchh since January 2022 are in the same category (Telecom): 11 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.1 acres, this one is smaller than 97% of them.
Where it is
Berdo, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation USOF Kachchh CAT-5/6 — application filed, 0 m away
- Permission for Underground Ofc Laying Work — lapsed, 5.7 km away
- Sumrasar to Bhirandiyara BSNL OFC Route — forest land use approved, 7.2 km away
- Permission for Underground Ofc Laying Work — lapsed, 7.5 km away
- Diversion of 3.55 Ha Forest Land for the Laying of Proposed Underground… — more information requested, 8.4 km away
- Shri Notiyar Abdreman Anvar — lapsed, 9.1 km away
- 765 kV D/C KPS3 (GIS) – Lakadia (AIS) Transmission Line for "Evacuation of… — under wildlife review, 9.1 km away
- Shri Jayesh Dhanji Rajgor — lapsed, 9.6 km away
More from Mahesh Nair in Kachchh
- Kachchh Wildlife 4G Saturation USOF Project — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.