Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 13 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mohamedarif Mohamed Taiyeb Saiyed |
| Land area | 400 m² |
| Forest land | 430 m² |
| Project cost | ₹15 lakh |
| Village / locality | Bhimpura |
| Taluk / tehsil | Amod |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14162 |
In context
38 applications in Bharuch since January 2022 are in the same category (Roads & highways): 12 approved, 15 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.1 acres, this one is smaller than 94% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhimpura, Amod, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved, 1.7 km away
- Approach Road (Entry and Exit) for Pidilite Industries Ltd — forest land use approved, 1.9 km away
- EC for Exploratory Drilling of 10 wells in the OALP block CB-ONHP-2021/2,… — environmental approval granted, 3.9 km away
- Permission for laying proposed 66KV line from existing 220KV Amod SS to Exi.… — initial checks, 5.1 km away
- Diversion of 23.4 Ha. Protected Forest land for four lanning of… — more information requested, 6 km away
- Permission for laying proposed 66KV, (1 C) 630 Sq. mm (3+1) Corrugated Power… — more information requested, 10.2 km away
- Laying proposed 8" Ø Steel Gas pipeline by GAIL — forest land use approved, 10.4 km away
- To Set Up Solar Park and Supply Power to Getco by Laying Transmission Line for… — forest land use approved, 12.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.