Project details
| Status | Forest land use approved |
|---|---|
| Status since | 2 Jun 2026 |
| Application filed | 6 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Forest land | 30 m² |
| Project cost | ₹1 lakh |
| Village / locality | Bhimpura |
| Taluk / tehsil | Amod |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14136 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhimpura, Amod, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0432 Ha. Protected Forest Land for Construct Approach road for… — forest land use approved, 1.7 km away
- Approach Road (Entry and Exit) for Pidilite Industries Ltd — forest land use approved, 3.5 km away
- EC for Exploratory Drilling of 10 wells in the OALP block CB-ONHP-2021/2,… — environmental approval granted, 3.9 km away
- Permission for laying proposed 66KV line from existing 220KV Amod SS to Exi.… — initial checks, 4 km away
- Diversion of 23.4 Ha. Protected Forest land for four lanning of… — more information requested, 7.5 km away
- Permission for laying proposed 66KV, (1 C) 630 Sq. mm (3+1) Corrugated Power… — more information requested, 9.1 km away
- Laying proposed 8" Ø Steel Gas pipeline by GAIL — forest land use approved, 9.2 km away
- Set up ground-mounted Panels Solar Power Project in Jambusar Taluka. Diversion… — forest land use approved, 11.2 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- Diversion of Forest Area – 0.0840 Ha. Permission for laying 33 KV 5-nos.… — forest land use approved
- FCA proposal to set up Solar Park Rajpardi, District Bharuch - Proposed… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.