What is this project?
Permission for Diversion of 0.0321 Ha. Reserved Forest Land for Laying of 140 Mm (5") Dia Drinking Water Pipeline for Tarnetar Boosting to Ranipar Jepar Ta.Thangadh, Surendranagar District is a proposed pipeline project in Navagam (Than), Thangadh, Surendranagar, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Dee Surendranagar Gwssb Sub Div-2.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Navagam (Than), Thangadh, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹60 crore; a site of 0.1 acres and 320 m² of forest land.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Jul 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Dee Surendranagar Gwssb Sub Div-2 |
| Land area | 300 m² |
| Forest land | 320 m² |
| Project cost | ₹60 crore |
| Village / locality | Navagam (Than) |
| Taluk / tehsil | Thangadh |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14321 |
In context
26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.1 acres, this one is smaller than 83% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Navagam (Than), Thangadh, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying Overhead 66 KV LILO Transmission Line from 66 kV Naladhari to 66 KV… — more information requested, 100 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line District Surendranagar Village… — forest land use approved, 1.8 km away
- Niravsinh Dilipsinh Parmar & Alpeshbhai Mahendrabhai Joshi — not approved, 2.3 km away
- Tarnetar Fire Clay — lapsed, 2.6 km away
- Ramkubhai Kanbhai Jalu & Rajubhai Alkubhai Jalu — environmental approval granted, 4.7 km away
- Shri Jalu Pravinbhai Ramkubhai — environmental approval granted, 4.9 km away
- Shri Alabhai Arjanbhai Khunti Reapprasial Area-3.29.82Govt. land & Survey no.-… — environmental approval granted, 5.1 km away
- Shardulbhai Kathadbhai Jalu — not approved, 5.4 km away
More from Dee Surendranagar Gwssb Sub Div-2 in Surendranagar
- Remodeling of Distribution Network of NCD-4 (GROUP 8) Regional Water Supply… — forest land use approved
- (Diversion of 0.4547 ha.)Remodeling of Distribution Network of NCD-4 (GROUP 8)… — forest land use approved
- Permission for Laying Drinking Water Pipeline in 0.092 Ha. Protected Forest… — forest land use approved
- Remodeling of S2- S3 Regional Water Supply Scheme of Surendranagar District… — forest land use approved
- Remodeling of Distribution Network of NCD-4 (GROUP 8) Regional Water Supply… — more information requested
- Remodelling of Distribution network of NCD-4 (GROUP 8) Regional Water Supply… — more information requested
About this information