Quick answers
What is this project?
Remodeling of S2- S3 Regional Water Supply Scheme of Surendranagar District based on Dholi Dhaja Dam and VBC is an approved pipeline project in Baldana, Wadhwan, Surendranagar, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Dee Surendranagar Gwssb Sub Div-2.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Mar 2026), as of 27 Nov 2026.
Where is it?
In Baldana, Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹155.2 crore; a site of 4.9 acres and 2,030 m² of forest land.
When was it filed?
The application was filed on 2 Jul 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 Mar 2026 |
| Application filed | 2 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Dee Surendranagar Gwssb Sub Div-2 |
| Land area | 4.9 acres (2 ha) |
| Forest land | 2,030 m² |
| Project cost | ₹155.2 crore |
| Village / locality | Baldana |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14358 |
In context
26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 4.9 acres, this one is larger than 87% of them.
Where it is
Baldana, Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Bharatsang Ramsang Gohil — environmental approval granted, 7.5 km away
- Shri Jitendrasinh Rambha Jadeja — not approved, 8.8 km away
- Thakarshibhai Shivabhai Kothariya — not approved, 8.8 km away
- 90mm Dia. Pe Natural Gas Pipeline Parallel and Crossing to Chuda Bhrugupur… — forest land use approved, 9 km away
- Shri Mahedrasinh Tanubha Jadeja — not approved, 9.3 km away
- Noc for 0.077 Ha. Entry/Exit Approach Road for Access to Petrol Pump on… — lapsed, 10.5 km away
- Permission for Laying Drinking Water Pipeline in 0.092 Ha. Protected Forest… — forest land use approved, 10.6 km away
- Seeking Prior Approval for Laying 400 Mm Dia. Drinking Water Pipeline on NH-51… — forest land use approved, 11.4 km away
More from Dee Surendranagar Gwssb Sub Div-2 in Surendranagar
- Remodeling of Distribution Network of NCD-4 (GROUP 8) Regional Water Supply… — forest land use approved
- (Diversion of 0.4547 ha.)Remodeling of Distribution Network of NCD-4 (GROUP 8)… — forest land use approved
- Permission for Laying Drinking Water Pipeline in 0.092 Ha. Protected Forest… — forest land use approved
- Remodeling of Distribution Network of NCD-4 (GROUP 8) Regional Water Supply… — more information requested
- Remodelling of Distribution network of NCD-4 (GROUP 8) Regional Water Supply… — more information requested
- Permission for Diversion of 0.0321 Ha. Reserved Forest Land for Laying of 140… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.