Project details
| Official title | Gas Distribution Network in Tankara & Morbi Taluka & Surrounding Area in Morbi District (Virpar CPRS to Value Seed, Honest Hotel and Lajai Village, Vishal Furniture to Bhaktinagar CPRS, Lilapar Mainline towards SP Road & Rajput Boarding to Pushparaj Looping Connectivity |
|---|---|
| Status | Forest land use approved |
| Status since | 6 Dec 2023 |
| Application filed | 8 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Lajai |
| Taluk / tehsil | Tankara |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14432 |
In context
19 applications in Morbi since January 2022 are in the same category (Pipelines): 16 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.4 acres, this one is larger than 86% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lajai, Tankara, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion in Existing Plant Capacity (Non-Ec Product) With Addition… — environmental approval granted, 2.2 km away
- Proposed Expansion in Existing Plant Capacity (Non-Ec Product) With Addition… — cleared for impact study, 2.2 km away
- Proposed Synthetic Organic Chemicals Manufacturing unit of M/s. Paras Polysol — environmental approval granted, 2.5 km away
- Proposed Synthetic Organic Chemicals Manufacturing unit of M/s. Paras Polysol — cleared for impact study, 2.5 km away
- PROPOSED SYNTHETIC ORGANIC CHEMICAL (UPR) MANUFACTURING UNIT WITHIN THE… — under environmental review, 2.5 km away
- APPLICATION FOR TRANSFER OF EC OBTAIBED VIDE LETTER NO.… — environmental approval granted, 3.2 km away
- 125 Mm Dia PE Pipeline for Extenson Of PE Pipeline For New Industrial… — forest land use approved, 6.4 km away
- TRANSFER OF EC OBTAIBED VIDE LETTER NO. SEIAA/GUJ/EC/5(F)/2020/2021, DATED:… — environmental approval granted, 7.4 km away
More from Gujarat Gas Limited in Morbi
- Diversion of 0.002 HA. of PF land for SEGA TILES PVT LTD connectivity Taluka… — in-principle approval, conditions pending
- Diversion of 0.0024 Ha. of PF Land for laying of 6" Dia NB Steel Gas Pipeline… — forest land use approved
- Diversion of 0.044 Hectare of Protected Forest Land for laying 125 MM dia. PE… — forest land use approved
- 6" Dia NB Steel Gas Pipeline Connectivity From FDODO CNG Point Vajepar, Taluka… — forest land use approved
- 125 Mm Dia PE Pipeline for Extenson Of PE Pipeline For New Industrial… — forest land use approved
- 125/90 mm Dia PE Gas Pipeline for extension of PE Pipeline for New Domestic… — forest land use approved
18 Gujarat Gas projects in Morbi
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.