Diversion of 0.2751 ha. Protected Forest Land for 11 KV HT Power Supply Cable from Tulshi Construction Estate

Diversion of 0.2751 ha. Protected Forest Land for 11 KV HT Power Supply Cable from Tulshi Construction Estate is a lapsed building project in Ambach, Pardi, Valsad, Gujarat. The site covers 0.7 acres. Its stated project cost is ₹2.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 1 Apr 2024).

See it on the live map All projects in Valsad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.2751 ha. Protected Forest Land for 11 KV HT Power Supply Cable from Tulshi Construction Estate is a lapsed building project in Ambach, Pardi, Valsad, Gujarat. The site covers 0.7 acres.

Who is building it?

The applicant is Dgvcl Vapi Rural.

Has it been approved?

No. The application was lapsed on 1 Apr 2024, so it is no longer under consideration.

Where is it?

In Ambach, Pardi, Valsad, Gujarat.

How big is it?

It has a stated cost of ₹2.4 crore; a site of 0.7 acres and 2,300 m² of forest land.

When was it filed?

The application was filed on 29 Jan 2023.

Project details

Official titleDiversion of 0.2751 ha. Protected Forest Land for 11 KV HT Power Supply Cable from Tulshi Construction Estate at Velvagad Faliya Village: Pariya to Ambach to Kherlav road to GETCO 66 KV Ambach Subsation Taluka: Pardi District: Valsad.
StatusLapsed
Status since1 Apr 2024
Application filed29 Jan 2023
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantDgvcl Vapi Rural
Land area2,800 m²
Forest land2,300 m²
Project cost₹2.4 crore
Village / localityAmbach
Taluk / tehsilPardi
DistrictValsad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14466

In context

64 applications in Valsad since January 2022 are in the same category (Buildings & townships): 46 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.7 acres, this one is smaller than 97% of them.

70 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ambach, Pardi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.