Quick answers
What is this project?
Proposed Residential Project (Row Houses) at Vill- Tukwada, Near Tighra Toll Plaza, NH-48, Vapi is an approved residential project in Tukwada, Pardi, Valsad, Gujarat. It plans 782 units on 58.8 acres.
Who is building it?
The applicant is Mukesh Undhad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2024), as of 27 Nov 2026.
Where is it?
In Tukwada, Pardi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹206.4 crore and a site of 58.8 acres.
When was it filed?
The application was filed on 24 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential Project (Row Houses) at Vill- Tukwada, Near Tighra Toll Plaza,…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2024 |
| Application filed | 24 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mukesh Undhad |
| Use | Residential |
| Units | 782 |
| Parking spaces | 987 |
| Land area | 58.8 acres (23.8 ha) |
| Built-up area | 2,06,238 m² (22,19,925 sq ft) |
| Plot area | 2,37,841 m² (25,60,097 sq ft) |
| Project cost | ₹206.4 crore |
| Village / locality | Tukwada |
| Taluk / tehsil | Pardi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05151 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jun 2024 (this page) | Environmental approval granted | 58.8 acres | ₹206.4 crore |
| Early planning filed 27 Jun 2023 | Cleared for impact study | 58.8 acres | ₹206.4 crore |
In context
64 applications in Valsad since January 2022 are in the same category (Buildings & townships): 46 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 58.8 acres, this one is larger than 94% of them.
54 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tukwada, Pardi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential Project (Row Houses) at Vill- Tukwada, Near Tighra Toll… — cleared for impact study, 0 m away
- Avadh Begonia — environmental approval granted, 950 m away
- "The Construction Project by M/s Payal Properties Private Limited" Located at… — environmental approval granted, 1.4 km away
- "new Residential Project" by Mr. Rakesh Merambhai Thumar at City Survey No.:… — environmental approval granted, 2 km away
- Diversion of 0.1544 Ha. protected forest land for laying 125/90 mm dia. MDPE… — lapsed, 2.1 km away
- Power project by M/s. Welspun Living Limited — environmental approval granted, 2.2 km away
- Rob in Liew of Lc No 82 at Km 177/6-8 Between Vapi-Udwada on Virar-Surat… — forest land use approved, 2.3 km away
- Diversion of 0.0508 Hectare Protected Forest Land for Laying 125/90 Mm… — lapsed, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.