Project details
| Official title | Proposal for Diversion of Protected Forest Land for the Project of Widening and Strengthening of Kheda Matar Tarapur Road Km. 84/00 to 86/250 |
|---|---|
| Status | More information requested |
| Status since | 19 Jul 2026 |
| Application filed | 7 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹4.4 crore |
| Village / locality | Sinjiwada |
| Taluk / tehsil | Matar |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14489 |
In context
7 applications in Kheda since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sinjiwada, Matar, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Hansika Chemicals — under environmental review, 3.1 km away
- Industrial project by M/s. HANSIKA CHEMICALS — returned to applicant, 3.1 km away
- 90/125mm Dia PE Gas pipeline Connectivity for Marala Village, Ta: Matar, Dist:… — forest land use approved, 12.3 km away
- Diversion of 0.6667 ha. Protected Forest land for the grant permission for… — more information requested, 13 km away
- Expansion of Grain Based Ethanol Plant From 250 Klpd to 325 Klpd by Enabling… — initial checks, 16.8 km away
- Diversion of Protected Forest Land for the Project of Four Lanning of Nadiad… — more information requested, 18 km away
- Diversion of Protected Forest land for laying of Proposed 90/125mm Dia. Gas… — lapsed, 22.7 km away
- Development Drilling of 108 Wells, Laying of 4" & 8"oil and Gas Flow Lines and… — environmental approval granted, 23.3 km away
More from Executive Engineer in Kheda
- Diversion of Protected Forest Land for the Project of Four Lanning of Nadiad… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.