CRZ Clearance of Proposed Salt Manufacturing by Solar Evaporation at Un- Surveyed Land (Part of Land Falling Under CRZ) located at Greater Rann of Kutch, Near Hajipir, Village: Luna, Taluka: Bhuj, Kutch, Gujarat by Neelkanth Salt Chem India Pvt. Ltd is a proposed building project in Na, Bhachau, Kachchh, Gujarat. The site covers 32,370.8 acres.
Who is building it?
The applicant is Neelkanth Salt Chem India Private Limited.
Has it been approved?
Yes. Its status is “Recommended by coastal authority” (since 19 Sept 2025), as of 27 Nov 2026.
Where is it?
In Na, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹7 crore and a site of 32,370.8 acres.
When was it filed?
The application was filed on 28 Jul 2025.
Project details
| Status | Recommended by coastal authority |
|---|---|
| Status since | 19 Sept 2025 |
| Application filed | 28 Jul 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Neelkanth Salt Chem India Private Limited |
| Land area | 32,370.8 acres (13,100 ha) |
| Project cost | ₹7 crore |
| Village / locality | Na |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14790 |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32,370.8 acres, this one is larger than 99% of them.
Where it is
Na, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Overhead 66 kV Transmission Line from Substation — under forest review, 8.7 km away
- Archean Chemical Industries — initial checks, 13.1 km away
- Diversion of 8.7980 Ha forest land of Village:Hajipir, Ta:Bhuj, Dist: Kachtchh… — lapsed, 20.1 km away
- Diversion of 2.33 Ha Forest Land of Village Nara, Ta: Lakhpat, Dist: Kutch… — more information requested, 20.2 km away
- Diversion of 16.6 Ha forest area for 220 KV D/C Akrimota - Nakhatrana & 220 KV… — lapsed, 20.8 km away
- Diversion of 16.6 Ha forest land of Banni grassland for Construction of… — lapsed, 20.8 km away
- Diversion of 15.623 ha Protected forest land for Construction of 220 KV… — forest land use approved, 21.1 km away
- Demanded Forest Area of Nara Village, Ta: Dayapar (Lakhpat), Dist: Kachchh for… — more information requested, 22.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.