Quick answers
What is Archean Chemical Industries?
Archean Chemical Industries is a proposed industrial project in Na, Bhachau, Kachchh, Gujarat. The site covers 25,014.5 acres.
Who is building it?
The applicant is Archean Chemical Industries Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Na, Bhachau, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1,443.7 crore and a site of 25,014.5 acres.
When was it filed?
The application was filed on 2 Jul 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 2 Jul 2024 |
| Application filed | 2 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Archean Chemical Industries Limited |
| Land area | 25,014.5 acres (10,123 ha) |
| Project cost | ₹1,443.7 crore |
| Village / locality | Na |
| Taluk / tehsil | Bhachau |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03043 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 25,014.5 acres, this one is larger than 99% of them.
Where it is
Na, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Overhead 66 kV Transmission Line from Substation — under forest review, 9.1 km away
- CRZ Clearance of Proposed Salt Manufacturing by Solar Evaporation at Un-… — recommended by coastal authority, 13.1 km away
- Diversion of Forest Land for Construction of 66 KV Over Headed Transmission Line — lapsed, 15.8 km away
- Diversion of Forest Land for Construction of 66 KV Overhead Transmission Line… — under forest review, 15.8 km away
- Diversion of Protected Forest Land for Up-gradation to 2L PS including… — more information requested, 17.3 km away
- Diversion of 8.7980 Ha forest land of Village:Hajipir, Ta:Bhuj, Dist: Kachtchh… — lapsed, 17.9 km away
- Diversion of 16.6 Ha forest area for 220 KV D/C Akrimota - Nakhatrana & 220 KV… — lapsed, 18.9 km away
- Diversion of 16.6 Ha forest land of Banni grassland for Construction of… — lapsed, 18.9 km away
More from Archean Chemical Industries Limited in Kachchh
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — lapsed
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — under environmental review
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — environmental approval granted
All 4 Archean Chemical Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.