Quick answers
What is this project?
Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA is a lapsed building project in Bhudha (Budha), Lakhpat, Kachchh, Gujarat. The site covers 81 acres.
Who is building it?
The applicant is Archean Chemical Industries Limited.
Has it been approved?
No. The application was lapsed on 8 Nov 2026, so it is no longer under consideration.
Where is it?
In Bhudha (Budha), Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹238.2 crore and a site of 81 acres.
When was it filed?
The application was filed on 10 Sept 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA
Project details
| Official title | Development of Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA at Village Kaiyari near Budh Bandar, Taluka Lakhpat, District Kachchh, Gujarat |
|---|---|
| Status | Lapsed |
| Status since | 8 Nov 2026 |
| Application filed | 10 Sept 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Archean Chemical Industries Limited |
| Land area | 81 acres (32.8 ha) |
| Project cost | ₹238.2 crore |
| Village / locality | Bhudha (Budha) |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14862 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Sept 2026 (this page) | Lapsed | 81 acres | ₹238.2 crore |
| New project filed 10 Mar 2026 | Under environmental review | 81 acres | ₹238.2 crore |
| Amendment filed 23 Aug 2024 | Environmental approval granted | 81 acres | ₹238.2 crore |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 81 acres, this one is larger than 77% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhudha (Budha), Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — under environmental review, 0 m away
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — environmental approval granted, 0 m away
- Project by Whitevibe Salt Private Limited — lapsed, 2.8 km away
- Jetty and Associated Facilities for Shree Cement Limited in Kori Creek, Gulf… — lapsed, 3.3 km away
- Project by Whitevibe Salt Private Limited — lapsed, 4.2 km away
- Widening and strengthening of Pandhro Narayansarovar Road — application filed, 4.4 km away
- Application for wildlife clearance for Diversion of 4.5 ha of Narayan Sarovar… — more information requested, 4.8 km away
- Widening and strengthening of Lakhapat to Koteshwar Road — application filed, 5.3 km away
More from Archean Chemical Industries Limited in Kachchh
- Archean Chemical Industries — initial checks
All 4 Archean Chemical Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.