Quick answers
What is this project?
CRZ Clearance for Development of Passenger Ferry Terminal at Koteshwar and Padala in Kori Creek, Gulf of Kutch, Gujarat by Gujarat Maritime Board (Government of Gujarat) is a proposed project in Kotesvar, Lakhpat, Kachchh, Gujarat. The site covers 5.9 acres.
Who is building it?
The applicant is Gujarat Maritime Board.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kotesvar, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹198.7 crore and a site of 5.9 acres.
When was it filed?
The application was filed on 30 Oct 2026.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 30 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Gujarat Maritime Board |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹198.7 crore |
| Village / locality | Kotesvar |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15034 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Oct 2026 (this page) | Under wildlife review | 5.9 acres | ₹198.7 crore |
| New project filed 22 Oct 2026 | More information requested | 5.9 acres | ₹198.7 crore |
In context
23 applications in Kachchh since January 2022 are in the same category (Other): 1 approved, 14 filed or under review, and 7 withdrawn, lapsed or rejected. At 5.9 acres, this one is smaller than 65% of them.
Where it is
Kotesvar, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- CRZ Clearance for Development of Passenger Ferry Terminal at Koteshwar and… — more information requested, 0 m away
- Widening and strengthening of Lakhapat to Koteshwar Road — application filed, 5.1 km away
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — lapsed, 6.3 km away
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — under environmental review, 6.3 km away
- Captive Salt jetty and associated infrastructure with throughput of 7 MMTPA — environmental approval granted, 6.3 km away
- Application for wildlife clearance for Diversion of 4.5 ha of Narayan Sarovar… — more information requested, 6.3 km away
- Widening and strengthening of Pandhro Narayansarovar Road — application filed, 6.9 km away
- Construction of Approach Roads for 11 Bop Under 18 Bn. — more information requested, 8 km away
All 6 Gujarat Maritime Board projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.