Quick answers
What is Laying of a 4-Inch Diameter Underground PVC Pipeline?
Laying of a 4-Inch Diameter Underground PVC Pipeline is a proposed pipeline project in Roziya, Dhrol, Jamnagar, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Gadara Devshibhai.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Roziya, Dhrol, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.3 acres and 550 m² of forest land.
When was it filed?
The application was filed on 2 Nov 2026.
Project details
| Official title | Laying of a 4-Inch Diameter Underground PVC Pipeline at Rojiya Village. |
|---|---|
| Status | More information requested |
| Status since | 3 Nov 2026 |
| Application filed | 2 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gadara Devshibhai |
| Land area | 1,100 m² |
| Forest land | 550 m² |
| Project cost | ₹10 lakh |
| Village / locality | Roziya |
| Taluk / tehsil | Dhrol |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-15060 |
In context
20 applications in Jamnagar since January 2022 are in the same category (Pipelines): 5 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.3 acres, this one is smaller than 80% of them.
Where it is
Roziya, Dhrol, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying UG 4 dia Inch PVC Pipeline at Vankiya Village — more information requested, 6.4 km away
- Laying of 66KV S/C Falla – Dhrangada underground cable line with 66KV,… — more information requested, 7.2 km away
- Shri Zala Yogendrasinh Vanrajsinh (Jaliya Mansar Ordinary Sand Block-A ) — lapsed, 7.5 km away
- Proposed Proposal for Enhancement of production capacity of the existing… — initial checks, 9 km away
- Expansion of existing Metallurgical Manufacturing Unit at Survey No: 249, 373,… — under environmental review, 9 km away
- diversion of 0.1739-hectare forest land for Laying of 66KV S/C Rampar-Stena… — more information requested, 9.7 km away
- Diversion of 0.0236 Ha Forest Land for 66KV Rampar Superspintex Line With… — forest land use approved, 10.5 km away
- Proposed Synthetic Organic Chemicals Manufacturing unit of M/s. Advait… — environmental approval granted, 11.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.