What is Developing? Open the mapMap

Initial checksBuildings & townships · Gandhinagar, Gujarat

Swastik Homes

Swastik Homes is a proposed building project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The site covers 0.8 acres. Its stated project cost is ₹45.9 crore. As of 27 Nov 2026, its status is “Initial checks” (since 20 Nov 2026).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Swastik Homes?

Swastik Homes is a proposed building project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The site covers 0.8 acres.

Who is building it?

The applicant is Karai Developers LLP.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Chiloda(Naroda) (Ct), Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹45.9 crore and a site of 0.8 acres.

When was it filed?

The application was filed on 4 Nov 2026.

Project details

StatusInitial checks
Status since20 Nov 2026
Application filed4 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKarai Developers LLP
Land area3,100 m²
Project cost₹45.9 crore
Village / localityChiloda(Naroda) (Ct)
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-15080

What the filings say

What is planned

Karai Developers LLP proposes the construction of "Swastik Homes," a mixed-use residential and commercial project. The applicant's project report describes a development consisting of three blocks (A, B, and C) with a maximum height of 14 floors above ground, plus two cellar levels and a hollow plinth for parking.

The project is planned to include 182 residential units and 8 commercial shops. The residential component is divided into 98 units of 2-BHK and 84 units of 3-BHK apartments. The commercial shops are located on the ground floor.

ItemDetail
Total Plot Area0.31 hectares (0.76 acres)
Total Built-up Area24,467.89 square metres
Total FSI Area14,904.16 square metres
Residential Units182
Commercial Units8
Maximum Floors14 Floors + Hollow Plinth + 2 Cellars
Excavation VolumeApproximately 28,000 cubic metres

Layout and design

The layout plan shows three interconnected blocks arranged around a central common plot of 311.28 square metres. The ground floor features a hollow plinth dedicated to parking alongside the commercial shops. The two cellar levels are also designated for parking.

Residential units are distributed across the upper floors. Blocks A and C each contain 56 units, while Block B contains 70 units. The design includes refuge balconies on the 5th, 8th, and 12th floors for safety. Internal movement is facilitated by a 7.0-metre wide approach road and 1.80-metre wide pathways.

Land and surroundings

The project is located at Nana Chiloda-Karai in Gandhinagar, within the limits of the Ahmedabad Municipal Corporation. The site is currently open land and is not used for agriculture. The surrounding area is described as a developing urban locality with schools and hospitals in the vicinity. The nearest railway station is Naroda, approximately 3.7 km away, and Ahmedabad Airport is about 6.05 km from the site.

Water, power and access

Water will be supplied by the Ahmedabad Municipal Corporation (AMC). The total water requirement during the operation phase is estimated at 168 kilolitres per day (KLD). After the first day, the fresh water demand will reduce to 116 KLD as 52 KLD of treated wastewater will be recycled for flushing and gardening.

Power will be sourced from Uttar Gujarat Vij Company Limited (UGVCL), with a demand of 2.0 MW during operation. A diesel generator set is proposed for emergency backup. Access to the site is provided via an 18.0-metre wide Town Planning Scheme (TPS) road.

Environmental safeguards

The applicant proposes a Sewage Treatment Plant (STP) with a capacity of 200 KLD to treat domestic wastewater. For solid waste, the project will use an in-house Organic Waste Converter to process approximately 277 kg per day of wet waste into manure. Dry waste (227 kg per day) will be collected by the municipal body.

Rainwater management includes the installation of one percolation well to recharge ground aquifers. The greenbelt is planned to cover 408.1 square metres (approximately 13.3% of the plot), consisting of 241.6 square metres of tree cover and 166.5 square metres of lawn. To mitigate heat island effects, the applicant plans to use non-reflective glass and light-coloured reflective paint on exposed surfaces.

Parking

The project provides a total of 259 Equivalent Car Spaces (ECS), exceeding the statutory requirement of 188 spaces.

Swastik Homes site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Swastik Homes: Site layout: building blocks, common plot, and internal roads (preview)🔒 Sign in free to see it
Site layout: building blocks, common plot, and internal roads
Swastik Homes: Key plan showing project location and surrounding survey numbers (preview)🔒 Sign in free to see it
Key plan showing project location and surrounding survey numbers
Swastik Homes: Technical drawing of the proposed percolation well for rainwater harvesting (preview)🔒 Sign in free to see it
Technical drawing of the proposed percolation well for rainwater harvesting

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 98% of them.

140 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.