Shyam Status 2 is an approved residential project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. It plans 312 units in 2 towers of up to 14 floors on 1.4 acres.
Who is building it?
The applicant is Accurate Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Jul 2025), as of 27 Nov 2026.
Where is it?
In Chiloda(Naroda) (Ct), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹44.8 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 20 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Jul 2025 |
| Application filed | 20 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Accurate Developers |
| Use | Residential |
| Units | 312 |
| Towers | 2 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 455 |
| Land area | 1.4 acres (0.6 ha) |
| Built-up area | 39,836 m² (4,28,791 sq ft) |
| Plot area | 5,369 m² (57,791 sq ft) |
| Project cost | ₹44.8 crore |
| Village / locality | Chiloda(Naroda) (Ct) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06949 |
What the filings say
What is planned
Accurate Developers proposes to develop a mixed-use commercial and residential project named 'Shyam Status 2' in Chiloda, Gandhinagar. The applicant's project report describes a development consisting of five blocks (A, B, C, D, and E) with a maximum height of 14 floors above ground, plus two basement levels for parking.
The project is designed to provide a total of 312 units. This includes 280 residential apartments and 32 commercial units. The residential component is categorized as Residential Affordable Housing (RAH), with units ranging in size up to 90 square meters. The commercial units are planned primarily on the ground floor of Block A.
Project Components
| Item | Detail |
|---|---|
| Total Units | 312 (280 Residential, 32 Commercial) |
| Building Blocks | 5 (Blocks A, B, C, D, E) |
| Maximum Floors | 14 Floors + 2 Basements |
| Residential Type | Affordable Housing (RAH) |
| Total Built-up Area | 39,835.73 square meters |
| FSI Area | 24,001.52 square meters |
| Common Plot Area | 612.38 square meters |
Layout and design
The layout plan indicates that the five blocks are arranged around a central common plot of 612.38 square meters (6,591 square feet). A 6.00-meter wide internal approach road provides access within the premises. The ground floor level includes a hollow plinth for parking, meter rooms, and telecommunication equipment rooms.
Vertical circulation is managed through multiple lifts: Block A is provided with two 10-passenger lifts and one 16-passenger fire lift, while Blocks B through E are each equipped with their own dedicated lifts ranging from 8 to 16-passenger capacity. Fire safety design includes fire-resistant doors (F.R.D.), external hydrants, and a dedicated fire tank.
Water, power and access
The project's water requirements during both construction and operation will be met through the Ahmedabad Municipal Corporation (AMC) water supply. For the operational phase, the applicant estimated a wastewater generation of 173 kilolitres per day (KLD). Of this, 86 KLD is planned for recycling, with the remaining 87 KLD discharged into the AMC drainage line.
Power will be sourced from the local grid, supplemented by a 136.62 KW rooftop solar energy system covering approximately 820.92 square meters of terrace space. Diesel Generator (D.G.) sets are planned for emergency backup. The site is accessible via an 18.00-meter wide Town Planning Scheme (T.P.S.) road.
Environmental safeguards
The applicant has proposed an Environment Management Plan with a capital expenditure of ₹2.98 crore. Key measures include:
- Water and Drainage: A 200 KLD Sewage Treatment Plant (STP) will be installed. Two percolation wells are planned for rainwater harvesting and groundwater recharge.
- Waste Management: An automatic Organic Waste Converter (OWC) with a capacity of 400 kg per day will handle biodegradable waste. A door-to-door collection system will be implemented, with 38 community bins of 80-litre capacity provided on-site.
- Air and Noise: D.G. sets will be housed in acoustic enclosures with stacks at least 3.0 meters high. Water sprinkling and tarpaulin shielding will be used during construction to control dust.
- Greenery: A green belt consisting of 135 trees and lawn areas will be developed within the project premises.
Shyam Status 2 site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 51% of them.
149 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential and Commercial Building Construction Project by Kabindra Kumar — environmental approval granted, 100 m away
- Sankalp Adwait — environmental approval granted, 100 m away
- The Rhythm Skyline — environmental approval granted, 150 m away
- The Rhythm Skyline — environmental approval granted, 150 m away
- Shivansh Sky Track — more information requested, 150 m away
- Swastik Homes — initial checks, 150 m away
- The Rhythm Elevat — environmental approval granted, 250 m away
- Shyam Status 4 — more information requested, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.